Super Post-Panamax Cranes Start Work at Port of Savannah

MarineLink.com
Wednesday, October 23, 2013
Photo: Georgia Ports Authority

All four of the super post-Panamax ship-to-shore cranes that arrived at the Port of Savannah in June are now fully operational at Georgia Ports Authority’s Garden City Terminal.

The cranes arrived on a specialized vessel June 5. After the cranes were offloaded, crews began raising the booms, and the electrical and machinery housings roughly 100 feet to their proper position. Additional on-site work included elevator installation and final wiring connections.

“Our new cranes, coupled with the pending harbor deepening and superior road and rail connections beyond our gates, mean the Port of Savannah is poised to take advantage of the next evolution in global commerce,” said GPA Executive Director Curtis Foltz.

The first of the new cranes went into service in August, with additional cranes coming online every few weeks. Today, the fourth new super post-Panamax crane begins moving cargo. Each new crane can lift up to 65 tons.

When the deeper Panama Canal opens in 2015, the average vessel calling on the U.S. East Coast is expected to shift from a capacity of 4,500 twenty-foot equivalent container units (TEUs) to approximately 9,000 TEUs. The larger vessels will offer 20-40% savings on shipping costs.

“The four additional ship-to-shore cranes increase our fleet to 27, including nine post-Panamax and 16 super post-Panamax cranes,” said Chief Operating Officer Griff Lynch. “Operating over 9,700 feet of contiguous berth space, the new equipment will mean even faster turn times for the vessels calling on Savannah -- generating both time and cost savings for port customers.”  

Lynch said ships calling on Savannah already enjoy immediate service upon arrival, instead of having to wait for a leased berth space to open. He added that the improvements to the Port of Savannah’s crane fleet demonstrate the GPA’s commitment to expand capacity, provide more opportunities for growth and greater flexibility to meet customer needs.  

“With on-terminal improvements such as these new ship-to-shore cranes and the state’s expansion of truck routes beyond our gates, Georgia is making the capacity improvements necessary to keep pace with global trade,” said GPA Board Chairman Robert Jepson.

gaports.com
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Bayport Dredging a Step Closer; Barbours Cut Pending

The U.S. Army Corps of Engineers has furnished the Port Authority its draft permit for the Bayport Channel Improvement project, Executive Director Roger Guenther

Petroecuador Tenders to Buy High Octane Naphtha

State-run Petroecuador has launched two tenders to buy a total of 22 cargoes, 240,000 barrels each, of high octane naphtha RON 87 and 93 for delivery starting on May 21-23,

DP World in Talks With Banks for $3b Loan

Dubai-owned port operator DP World is in talks with lenders to triple the size of an existing $1 billion loan, as well as extend the lifespan and reduce the interest rate,

Container Ships

Matson Declares Q2 2014 Dividend

Leading US carriers in the Pacific, Matson, Inc., apprises it has declared a second quarter 2014 dividend of $0.16 per common share. "Today's authorization continues

At Hamburg port E-mobility Project, BESIC enters crucial phase

Ten battery-operated heavy goods vehicles now transport containers between ships and the yard at the highly automated handling facility in the HHLA Container Terminal Altenwerder (CTA).

UASC Introduces New Asia - Europe Network

UASC has introduced its new Asia – Europe Network with three new services (AEC1, AEC3, AEC4), and two enhanced services (AEC8, AEC9). These services will broaden

News

Bayport Dredging a Step Closer; Barbours Cut Pending

The U.S. Army Corps of Engineers has furnished the Port Authority its draft permit for the Bayport Channel Improvement project, Executive Director Roger Guenther

At Hamburg port E-mobility Project, BESIC enters crucial phase

Ten battery-operated heavy goods vehicles now transport containers between ships and the yard at the highly automated handling facility in the HHLA Container Terminal Altenwerder (CTA).

Life Rafts Not Functioning On Sunk Ferry's Sister Ship

South Korean investigators said on Friday that life rafts and escape chutes on a sister ship to a sunken ferry were not working properly. The Sewol ferry, weighing almost 7,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1867 sec (5 req/sec)