Navy Prepares Ike for the Shipyard

MarineLink.com
Thursday, August 08, 2013
USS Dwight D. Eisenhower (CVN69). (U.S. Navy photo by Mass Communication Specialist 2nd Class Ryan D. McLearnon)

After back-to-back deployments, USS Dwight D. Eisenhower (CVN69) (IKE) will be headed to Norfolk Naval Shipyard in Portsmouth for some necessary maintenance during a scheduled docking planned incremental availability (DPIA) period.

A DPIA period is a time for a ship to undergo work and to receive needed improvements to maintain its optimal running efficiency. Over the course of the DPIA, IKE will go through both ship's-force maintenance and contractor work to obtain this goal.

"This work includes things like changing out the tile, getting your space painted, fixing your ladders and doors, and getting your berthing worked on," said Master Chief Damage Controlman Terry D. Wylie, IKE's Engineering department master chief. "The other side of this will be the contractors working on a variety of different big jobs."

IKE starts preparing for her shipyard period Friday beginning with a process called Smart Start.

"Smart Start is designed to transition IKE from the enormously successful operational mode to the different mode of maintenance," said Capt. Steve Koehler, IKE's commanding officer. "The focus of effort for all of us is ensuring conditions are set throughout the ship to start the maintenance on day one, hard-firing on all cylinders."

IKE is scheduled to head to the shipyard in September for a 14-month maintenance period.

navy.mil
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Seaspan Shipyard's Prompt Response to Canadian Coast Guard

Seaspan Shipyard’s long-standing relationship with the Canadian Coast Guard was proudly showcased in recent days, with simultaneous repair and maintenance work

Energy Storage System Ordered for LNG Battery Hybrid Ferry

Norwegian hybrid to be the first LNG battery ferry to operate on commercial routes Corvus Energy, Siemens AS and Fjord1 have announced the award of the contract for the Fannefjord LNG hybrid ferry.

N-KOM Recognized for Shipyard Safety, Security

Nakilat-Keppel Offshore & Marine (N-KOM) received the Safety & Security Award at the inaugural edition of The Maritime Standard (TMS) Middle East & Indian Subcontinent Awards,

Navy

HMAS Success Deploys to Middle East

After months of preparation, HMAS Success departed Garden Island in Sydney today for a six-month deployment to the Middle East Region to provide logistic support

USS Oscar Austin Deploys to 6th fleet

Arleigh Burke-class guided-missile destroyer USS Oscar Austin (DDG 79) departed Naval Station Norfolk Nov. 21 for a deployment to the U.S. 6th Fleet area of responsibility (AOR).

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Eye on the Navy

HMAS Success Deploys to Middle East

After months of preparation, HMAS Success departed Garden Island in Sydney today for a six-month deployment to the Middle East Region to provide logistic support

USS Oscar Austin Deploys to 6th fleet

Arleigh Burke-class guided-missile destroyer USS Oscar Austin (DDG 79) departed Naval Station Norfolk Nov. 21 for a deployment to the U.S. 6th Fleet area of responsibility (AOR).

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2400 sec (4 req/sec)