FPSO OSX-1 Begins Journey Toward Brazil Production

Tuesday, August 23, 2011
File

FPSO OSX-1, the first floating production, storage and offloading vessel in OSX’s fleet, has concluded its conversion in Singapore and set sail for Brazil. The journey is estimated to take 40 to 50 days.
The FPSO OSX-1 is commissioned to produce the first oil for itsclient OGX, which is expected to start oil production during the fourth quarter of 2011. Chartered by OGX for a period of 20 years at an average day rate of $263,000, FPSO OSX-1 will be employed in the Waimea accumulation, in the Campos Basin. “Last week, I participated with OSX’s and OGX’s teams in the sail-away ceremony of FPSO OSX-1 in Singapore, symbolizing the official delivery of the unit, which is an important achievement for both companies,” said Carlos Bellot, OSX’s Leasing and Chief Operation Officer.
FPSO OSX-1 was built in Korea, and was customized to meet the technical specifications required by OGX and Brazilian law in the Keppel shipyard, in Singapore, which carried out the construction, modification and upgrade of the modules located on the hull, known as the “topside”. Both shipyards have a strong reputation for carrying out these activities.
“For OSX, receiving the FPSO OSX-1 means the beginning of a routine that will be repeated dozens of times from now on: OSX delivering FPSOs and WHPs for production of oil and gas by our client OGX, and by other companies dedicated to making real the oil discoveries that Brazil has been conquering,” concluded Luiz Eduardo Guimarães Carneiro, OSX’s Chief Executive Officer.
www.osx.com.br/osx-1
 

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Dutch Shipbuilders Held Fast in Difficult 2012

The Holland Shipbuilding Association say that the various shipbuilding sectors presented a mixed picture in the past year, ship repair & supereyact construction did well, not so large new-buildings.

BAE Systems Lays Keel for Jackson Offshore PSV

BAE Systems holds a keel laying ceremony for the first of 4 platform supply vessels for Jackson Offshore Operators. The new vessels, which will support drilling operations in the Gulf of Mexico,

Austal-built JHSV 2 Completes Navy Acceptance Trials

Joint High Speed Vessel 'USNS Choctaw County' (JHSV 2) has successfully completed Acceptance Trials in the Gulf of Mexico. This milestone achievement involved

Offshore

BAE Systems Lays Keel for Jackson Offshore PSV

BAE Systems holds a keel laying ceremony for the first of 4 platform supply vessels for Jackson Offshore Operators. The new vessels, which will support drilling operations in the Gulf of Mexico,

Three MacGregor Offshore Cranes Specified for New DSV

A new dive support vessel (DSV), optimized for operations in the North Sea, will feature three MacGregor offshore cranes, enabling efficient load-handling in the subsea environment.

Lankofirst Trials New Fiber Rope Connectors

Lankofirst said offshore trials of its synthetic fiber rope mooring connector have shown a reduction in mooring line deployment times and improvements in health

Tanker Trends

Tankship Surplus Hits Clean Tanker Rates

Clean tanker rates for refined petroleum products on top export routes soften with build up of ships pressurizing the transatlantic market. Rates for medium-range (MR) tankers for 37,

Jason Tieman to Address Upcoming ILTA Conference

PortVision’s Jason Tieman will speak to the International Liquid Terminals Association (ILTA) Conference on 'New Ways toMaximize Uptime & Utilization with Limited Resources'.

N.Y. Open House for Tanker's 75th Birthday

All are welcome to visit the Tanker Mary A. Whalen on Pier 11, Atlantic Basin, Red Hook, Brooklyn on Tuesday, May 21. Our short stay in Atlantic Basin, in Red

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright