B+V Starts Navy Production

Wednesday, November 02, 2011
 Blohm + Voss recently had a laying-down ceremony for the 125-class (F125) frigate took place at building dock 12 at the Hamburg shipyard. The ceremony was organized by the F125 Work Group (ARGE F125), consisting of ThyssenKrupp Marine Systems AG – who commissioned Blohm + Voss Naval GmbH to complete the order – and Friedrich Lürssen Werft GmbH & Co. Following a three-year design and management phase, and six months after production started on the first section, the festive laying-down of the first hull section marks the continuation of the first 125-class frigate according to schedule.
In implementing the F125 frigate program, the German shipbuilding industry will once again be demonstrating its capacity to innovate and its innate strengths. Designed and equipped for deployment as part of allied defense missions and crisis prevention, as well as supporting humanitarian rescue missions, counter-terrorism and the combating of asymmetric threats, the 125-class frigate is one of the world's most advanced frigates. The 125-class frigate's outstanding mission versatility is matched by an innovative complement model and a systematic, technical implementation of the intensive use capability principle: despite considerably reduced crew numbers, this approach means mission duration can be extended significantly beyond the typical limit for frigates.
The building contract signed in June 2007 stipulates the production of a total of four 125-class frigates, which are to be delivered by the F125 consortium between spring 2016 and 2018. The German Navy's frigate program has a key role to play not only in ensuring the retention of the innovation-driving expertise possessed by German shipbuilding and the suppliers to this sector, but also in maintaining job security for what is one of Germany's key industries.
 
Main characteristics:
Length:                                   149 m
Breadth:                                  18 m
Max. speed:                           >26 kn
Displacement:                        approx. 7000 t
Complement:                         max. 190 (with a core complement of up to 120)
 
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Bahri Inks Contracts with Hyundai to Build 5 VLCCs

The National Shipping Co. of Saudi Arabia (Bahri) signed contracts on Thursday with Hyundai Samho Heavy Industries (HSHI) to build five very large crude carriers (VLCCs),

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

Navy

Libyan War Plane Bombs another Tanker

A fighter jet operated by Libya's military force backed attacked an oil tanker that was about to anchor in the northern city of Sirte, reports local media.   Lt Gen.

US Navy Submarine to be Named USS New Jersey

The U.S. Navy's next Virginia-class attack submarine will bear the name USS New Jersey, says AP reports.   U.S. Secretary of the Navy Ray Mabus hosted a ship-naming

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

 
 
Maritime Contracts Maritime Standards Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2769 sec (4 req/sec)