Newport News Installs Propellers on USN Aircraft Carrier

MarineLink.com
Thursday, October 03, 2013
Lindell Toombs, a Newport News shipbuilder with 41 years of experience, applies a protective coating to one of the four propellers on the aircraft carrier Gerald R. Ford (CVN 78). Photo by Chris Oxley

Huntington Ingalls Industries (HII) announced that the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78) has put on significant weight in the dry dock at its Newport News Shipbuilding division with the installation of four 30-ton bronze propellers. At 21 feet in diameter, each propeller spins to push the aircraft carrier through the water.

"Installation of the propellers culminates more than 10 months of focused work by numerous trades in support of installing the underwater shafting," said Rolf Bartschi, NNS' vice president, CVN 78 carrier construction. "The configuration of the blades, the weight of the propellers and the extremely tight tolerances required make this a challenging installation. I commend the rigging and machinery installation mechanics for a job well done."

Gerald R. Ford's primary hull structure reached 100% structural completion in May, bringing more than three years of structural erection work to a close. Work continues on the ship, including the piping and electrical systems and the habitability areas such as the galley and mess spaces. The ship's christening is scheduled for November 9.

huntingtoningalls.com
 

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Missing Person Rescued Near Brackettville

On July 31, Border Patrol Search Trauma and Rescue (BORSTAR) agents and CBP Office of Air and Marine rescued a man who was reported missing the previous morning.

Ross is Fleet Manager, Heidmar

Heidmar announced the promotion of Duncan Ross to Fleet Manager. Duncan joined Heidmar’s London office in 2012 as vessel manager.  Prior to joining Heidmar,

Fire Aboard USS Mount Whitney

A fire broke out on board USS Mount Whitney (LCC 20) while the ship was in Viktor Lenac Shipyard (Rijeka, Croatia) July 31, 2015. There were no personnel injuries in the fire,

Marine Equipment

Fire Aboard USS Mount Whitney

A fire broke out on board USS Mount Whitney (LCC 20) while the ship was in Viktor Lenac Shipyard (Rijeka, Croatia) July 31, 2015. There were no personnel injuries in the fire,

LR First to Certify Small Caribbean Ships

LR is the first class society to certify small commercial ships operating in the Caribbean After becoming the first classification society to issue Cargo

Optimized Tug-Barge System Designs by Robert Allan

Optimized Tug-Barge System Designs by Robert Allan Ltd. by David R. Connand Robert G. Allan, P.Eng. Some veteran Mississippi pushboats and barges have been

Eye on the Navy

Fire Aboard USS Mount Whitney

A fire broke out on board USS Mount Whitney (LCC 20) while the ship was in Viktor Lenac Shipyard (Rijeka, Croatia) July 31, 2015. There were no personnel injuries in the fire,

South China Sea Hotline in the Works

China and Southeast Asian nations have agreed to set up a foreign ministers' hotline to tackle emergencies in the disputed South China Sea, a senior official of

Fond Farewell to HMAS Tobruk

The Governor-General, His Excellency General the Honourable Sir Peter Cosgrove, AK, MC (Retd), together with the Assistant Minister for Defence Stuart Robert, MP,

 
 
Maritime Contracts Maritime Standards Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2345 sec (4 req/sec)