Songa Providing Statoil with New Rig Type

Tuesday, July 05, 2011
Image courtesy Statoil

Statoil has awarded the contract for construction of two new drilling rigs for use on the Norwegian continental shelf (NCS) to Songa Offshore.

The contract for the two category D rigs is worth an aggregate USD 2,47 billion for a fixed eight-year charter period.
"Stepping up our industrialisation of the NCS we are very pleased to announce that Songa will help realise our industrial approach and we wish to give them recognition for their long-term perspective on this partnership", said Jon Arnt Jacobsen, Statoil's chief procurement officer. "Through joint efforts we intend to rejuvenate the rig fleet on the NCS and ensure that we use the right rig for the right purpose."
 
Great interest in the market
"This procurement process has certainly attracted great interest among rig entrepreneurs, contractors and investors", said. "Many bidders have taken part in this process and the competition has been keen. Considering that we are ready to start this less than two years after the idea was launched, I consider this a success story!"
 
Capable of operating in 100 to 500 metres of water this specially designed category D drilling rig can drill wells down to 8,500 metres. It will be a workhorse on mature fields, primarily drilling production wells and completing wells, enabling Statoil and its partners to produce more oil from the fields.
 
New workhorses at Troll
Troll is the very cornerstone of Norwegian gas production, and also one of the largest oil fields on the NCS, oil production in 2010 totalling more than 120 000 barrels per day.
 
Holding many world records Troll will now also be the first field to be serviced by the new specially designed rigs. Statoil has awarded the contract for the charter of the two first category D rigs on behalf of the Troll licence.
 
 
"Statoil and its Troll partners have high ambitions for the further development of the field and we are pleased to have taken a decision to charter two specially designed rigs", said Hans Jakob Hegge, Statoil's senior vice president for Eastern North Sea operations in Development and Production Norway.
 
"We will now have a tool capable of performing the demanding tasks ahead. The rig capacity on the NCS is limited, and increased capacity is essential to ensure enhanced recovery. The new rigs are expected to operate 20% more efficiently than conventional rigs, and we look forward to having the new rigs up and running from 2014."
 
Suppliers from Norway and Korea
A hull designer, several topside suppliers, yard and rig entrepreneurs have helped develop the category D rig concept. Songa has assigned the rig construction work to the DSME yard in South-Korea. Aker Solutions has been picked as the supplier of the drilling equipment.
 
The project concept and design has taken one year and the implementation period is expected to take three years, including detail engineering, construction and transportation to the NCS.
 
The mobilisation from the yard in South-Korea to the North Sea is included in the contract value and will take about three months. The rig hand-over is scheduled for the second half of 2014.
 
Further opportunities
The fixed contract period is for eight years per rig, with four three-year options, i.e. in practice a 20-year contract per rig. This is a long-term approach, which ensures rig capacity for Statoil's growth ambitions, as well as predictability for the rig company.
 
Statoil is considering including two more category D rigs in its portfolio. For this purpose Statoil has secured the opportunity to exercise its option for two category D rigs from Songa Offshore, but is also continuing its evaluation of the received bids from other bidders.
 
During the last half of 2011 Statoil will consider various contractual solutions to ensure the construction of another two category D rigs, including the opportunity to take an ownership position in the rigs.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Two Navy Contracts for GD Bath Iron Works

Included in the latest listing of contracts awarded by the US Department of Defense, Navy, are two contracts with General Dynamics Bath Iron Works, Bath, Maine.

Newport News Shipbuilding's Apprentice School to partner Old Dominion University

The Signing of a memorandum of understanding between the Apprentice School and Old Dominion University (ODU) will take place tomorrow (23rd April) at 3101 Washington Ave.

Viking Welding Delivers Fire/Rescue Boats

Fire Departments in South Carolina and Minnesota have recently accepted delivery of Response FR-28 and FR-31J boats built of welded aluminum by Viking Welding & Fabrication in Kensington, N.

Offshore

BP Gulf Spill Trial Set For January

The high-stakes penalty phase of BP's trial over its role in the 2010 U.S. Gulf of Mexico oil spill will start next January, court officials said on Tuesday,

North Sea Maintenance Offsets Lack of Sales to Asia

North Sea Forties crude differentials were unchanged on Tuesday in light trade, supported by upcoming North Sea maintenance, but the forward curve weakened due

Saipem: A Fleet Grows in Brazil

As some pre-salt plays begin production, a wide range of subsea infrastructure is being built, with O&G transportation pipeline grids being one of the vital downstream systems.

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1438 sec (7 req/sec)