Incat Crowther to Design Quicksilver 6 Passenger Ferry

Tuesday, March 15, 2011
Image courtesy Incat Crowther

Incat Crowther has secured a contract to design a 138-ft Wave Piercing Catamaran Ferry for Quicksilver Bali. The Indonesian operator runs day tours and dinner cruises out of Bali, using the Incat Crowther-designed Wave Piercing Catamaran Quicksilver 6. 

Under construction at PT Caputra Mitra Sejati Shipyard, the vessel will be built to Lloyd’s Register and carry 450 passengers in two salons and on three outdoor decks. In addition to passengers, the vessel will carry up to 50 crew, many of whom work at the operator’s pontoon at Nusa Penida Island. At this pontoon, the operator offers activities including snorkelling, semi-submersible scuba, jet skiing and even tattooing. The vessel is configured to not only transport this small army of support staff to the pontoon, but also to allow meetings and briefings onboard during the outbound voyage.
 
Incat Crowther worked in close collaboration with Quicksilver Bali to develop a vessel optimized for the service being offered. Many features have been implemented to increase passenger comfort, such as window washing platforms on both decks. Safety demonstrations and live music shows performed on the main deck are relayed throughout the vessel via the integrated AV system.
 
The main deck interior cabin features seats for 268 passengers, and has a large bar at the aft end. Adjacent to the bar is a dual-entry cool room, which allows for quick loading of supplies, and immediate access from the bar. Behind the bar and cool room are extensive amenities. A total of 15 toilets are fitted, in ladies and gents rooms.
 
The mid deck cabin seats 168 passengers, with a small servery aft. The servery is linked to the main deck bar via a dumb waiter. The aft mid deck has 42 exterior seats. Stairs lead from this deck to a large sundeck, with 50 outdoor seats and ample standing room.
 
The vessel will have multiple boarding points to allow quick embarkation and disembarkation. Large aft quarter decks are provided for transfer of passengers to the pontoon. These load into broad stairs that link to the main deck boarding area. Large passageways and stairs are provided to the main deck cabin and the mid deck. There are also passenger loading gates on the mid deck. At the aft end of the main deck is an area reserved for luggage trolleys and supplies for the pontoon. These are loaded by a pair of davits outboard allowing loading and unloading on both sides.
 
The design of the vessel pays particular attention to adequate access for maintenance of machinery and to the fast and easy removal of engines for major overhauls. The vessel is fully compliant with IMO HSC stability regulations, providing a level of safety exceeding regulations for domestic use.
 
The vessel will be powered by four Caterpillar C32 Acert C engines, each producing 1080kW. Propulsion is carried to KaMeWa 50A3 waterjets via ZF3050/D gearboxes and cardan shafts. The vessel will have a service speed of 26 knots and a top speed of 30 knots. Extensive long-range fuel tanks will be fitted, giving the vessel a delivery range of 800 nm.
 
As the pioneer of the Wave Piercing Catamaran, Incat Crowther is pleased to be working with Quicksilver Bali to evolve this technology, creating a modern state-of-the-art vessel.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Search for Missing after Philippine Ferry Sinks, 38 dead

Divers will search waters in the central Philippines on Friday for 15 people still missing after a ferry carrying 187 passengers and crew sank a day earlier,

Silversea Cruises Plans New Flagship

Cruise operator Silversea Cruises has unveiled its new flagship, the Silver Muse, which will begin sailing the seas in April 2017.    Built by Italian shipbuilding company Fincantieri,

Silversea Cruises Orders Luxury Ship from Fincantieri

Shipbuilder Fincantieri has received an order to build a new luxury cruise ship for client Silversea Cruises due for delivery in April 2017.    At 40,700 grt and accommodating 596 guests,

Naval Architecture

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Offshore Oil Pipelines Pod Propulsion Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1042 sec (10 req/sec)