New Recommended Practices for U.S. BOP Compliance

Monday, September 13, 2010

In order to support the oil and gas industry in complying with the US Department of Interior’s new regulations for immediate re-certification of subsea BOP (blow-out preventer) stacks, DNV has issued a Recommended Practise guiding owners and operators through requirements and technical aspects.

As one of the responses to the Deepwater Horizon accident, the US Department of Interior former Minerals Management Service issued increased safety measures for energy development on the outer continental shelf. One of these called for an immediate re-certification of subsea BOP stacks by an independent, third-party that:
•    Blowout preventers will stop the flow of oil, when activated
•    The well design has proper casing or cement lining
•    The driller has certified it has conducted all necessary tests and is in compliance with all regulations

Oil companies have complained about the lack of clarity over the new rules. “To support the industry with guidance and a tool for the re-certification DNV, has issued a Recommended Practice for re-certification of blowout preventers and well control equipment for the US outer continental shelf,” said Elisabeth Tørstad, COO DNV Americas and Sub-Saharan Africa.

DNV supports the US authorities’ requirement for re-certification. “We recommend that a major overhaul and inspection of BOP and well control equipment used for drilling, completion, work-over and well intervention operations should be performed at least every five years. By doing this on a regular basis, the operator is able to verify and document that the equipment’s condition and properties are within the specified acceptance criteria as well as the specified recognised codes and standards,” she concluded.
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1189 sec (8 req/sec)