Aker to Support Redevelopment of Landmark Subsea Field

Press Release
Wednesday, March 13, 2013
Photo: Aker Solutions

Aker Solutions has secured a NOK 650 million (GBP 70 million) contract with BP to help redevelop one of the largest oil fields in the U.K. sector.

The Aberdeen operation of Aker Solutions will manufacture and supply all subsea controls equipment for the Quad 204 project, the redevelopment of the Schiehallion and Loyal fields located approximately 100 miles west of the Shetland Islands.

The scope of work includes subsea controls equipment for subsea trees, manifolds and subsea safety isolation valves as well as controls distribution assemblies.

The Schiehallion and Loyal fields are estimated to contain a further 450 million barrels of recoverable oil and a GBP 3 billion upgrade is underway. Due to the water depth in the area, Schiehallion is entirely reliant on subsea production technology and is collected on a floating production, storage and offloading vessel (FPSO).

The deliverables will be managed, designed and built by Aker Solutions' subsea controls center of excellence in Aberdeen with the first deliveries made in the first half of 2014.


Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


GTT Inks Framework Partnership Deal with CERN

GTT, a designer of membrane containment systems for the maritime transportation and storage of liquefied natural gas (LNG), has signed a Framework Partnership Agreement

India Extends Tax Benefits on Bunker Fuel

India has extended the benefit of nil custom and production tax on bunker fuels to domestic coastal movement of containers, in a move to decongest its roads and reduce carbon emissions,

NMEA Award for Simrad HALO Pulse Compression Radar

Simrad HALO Pulse Compression Radar has been awarded the Technology Award at the 2015 National Marine Electronics Association (NMEA) Conference and Expo in Baltimore, Md.

Offshore Energy

SBM Offshore Says Petrobras Discussions Ongoing

Floating production services provider SBM Offshore responded to media reports of a potential settlement with Petrobras regarding tenders in Brazil, stating the

Shell Starts Bonga Phase 3 in Nigeria

Shell Nigeria Exploration and Production Company Ltd (SNEPCo) announced the start-up of production from the Bonga Phase 3 project.   Bonga Phase 3 is an expansion of the Bonga Main development,

Workers Evacuated After Gas Leak at Mexico Platform

Mexico's state-owned oil company Pemex said on Tuesday that it was working to control a gas leak at the Sihil A platform in the Gulf of Mexico.   Eighty-five workers have been evacuated,

Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1763 sec (6 req/sec)