Volvo Penta Reduces Custom Engine Lead Time

By Eric Haun
Wednesday, May 28, 2014

Volvo Penta Quickline Provides Fast Delivery of Custom Engines for Repowering Commercial Marine Vessels

Volvo Penta’s new Quickline custom production line is now running full steam, reducing lead times for commercial marine customers with short-fuse requirements for replacement engines.

“When commercial boat operators experience a serious engine breakdown, they need action right away to avoid expensive downtime,” said Ron Huibers, president, Volvo Penta of the Americas. “The longer a vessel is down, the more money the operator stands to lose. That’s why we created Quickline, a separate production line that cuts manufacturing lead times for custom engines to as little as a week.”

Introduced in September 2013 at the Volvo Penta manufacturing facility in Gothenburg, Sweden, Quickline runs parallel to the regular production line at the plant. With Quickline, Volvo Penta can produce custom-built, classified and non-classified 300- to 750-hp D9MH, D13MH or D16MH propulsion engines within seven days of order, regardless of the make of engine the customer was using at the time of breakdown.

“Quickline provides an important supplement to the local engine stocks regionally and at our Power Center partners,” said Huibers. “It gives us another way to help commercial marine customers with unplanned repower needs to get back to business as quickly as possible. Because Volvo Penta is also authorized to do full approval tests for DNV, RINA, LRS, ABS and BV, we can deliver engines that are fully classed according to these societies within a seven-day period.”

Quickline owes its speed to the use of base engines in inventory at the Volvo Penta plant. To speed up the production process, these base engines will be custom-built, unlike engines kept in stock at dealers. While engine modules and options are more limited than they would be in regular engine production, they will satisfy most repower applications.

“This new custom production line is just the latest part of Volvo Penta’s approach to 24/7 customer service,” said Huibers. “It’s our way of showing customers we are there to support them in any way we can.”
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

MacGregor's Hatlapa Brand is 95 Today

November 2014 marks the 95th anniversary of MacGregor's Hatlapa brand. Since its foundation in 1919 by German engineer Max Hatlapa, the formerly independent Uetersen-based

Pair of ASD Tugboats Delivered to Keppel-Smit

The ASD tugs KST Passion and KST Pride were were delivered to their owner, Keppel-Smit Towage Pte. Ltd of Singapore in October 2014. The two vessels are the first

Marine Power

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

Pair of ASD Tugboats Delivered to Keppel-Smit

The ASD tugs KST Passion and KST Pride were were delivered to their owner, Keppel-Smit Towage Pte. Ltd of Singapore in October 2014. The two vessels are the first

Shell Launches Naturelle Stern Tube Fluid

Shell has launched its new range of Environmentally Acceptable Lubricants (EALs), including Shell Naturelle S4 Stern Tube Fluid 100.   The Shell Naturelle range

Marine Equipment

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

Deepwater Semi-Sub COSL Prospector Delivered

COSLProspector, the fourth deep-water semi-submersible drilling rig built by CIMC Raffles for China Oilfield Services Limited (COSL), has been delivered in Yantai, Shandong Province.

 
 
Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1075 sec (9 req/sec)