Aberdeen Harbour Completesl Quay Refurbishment

Press Release
Wednesday, May 18, 2011

Aberdeen Harbour Board has announced the completion of a £4 million refurbishment project at Commercial Quay East while welcoming the arrival of a new £1 million workboat.

The reconstruction work at Commercial Quay East began in January 2010, with main contractor, McLaughlin and Harvey Ltd working alongside Glasgow-based consultant engineering firm Jacobs’, to undertake a varied programme of works.

The project, part of Aberdeen Harbour Board’s £65 million development plan, included refurbishing the quay’s existing, 170-metre-long wall, before installing replacement shipping water points, rainwater drainage system and ducts for possible future services. The quay is now fit for purpose for the demands of today’s cargo handling equipment and cargoes. It has since been deepened to 7.5 metres. This will allow the port a greater degree of flexibility and enable the harbour to support larger projects including land based and offshore renewable energy.

Aberdeen’s Harbour’s continued investment was also demonstrated with the recent arrival of a new, 14-metre-long workboat, Sea Herald.

Designed by Macduff Ship Design and built by Macduff Shipyards, it is equipped with a range of features, including a multi-beam hydrographic survey suite, deck crane, twin 350hp engines giving a speed of 9.6 knots and bollard pull of 9.5t, which will enable it to undertake a variety of tasks; from debris removal and bed levelling work to hydrographic surveys and occasional pilot duties.

Engineering director, Ken Reilly, said: “As part of our development strategy, the refurbishment of Commercial Quay East is just one part of the larger vision we have for Aberdeen Harbour in maintaining the high level of service we currently provide for our customers.

“The harbour is an integral part of the North-east’s infrastructure and continued investment, whether it be for the refurbishment of facilities or the provision of new vessels such as the workboat, will cement our reputation as being the centre of activity for the energy industry’s marine operations in North-west Europe.”

Ray Shaw, operations director and harbour master at Aberdeen Harbour, added: “It is important for us to continue to provide the best service and facilities for our customers. The new vessel will make an important contribution to harbour activities and demonstrates our commitment to ensuring Aberdeen Harbour remains one of the UK’s busiest and most efficient ports.”
 

Source:  www.aberdeen-harbour.co.uk

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Singapore’s Mega Terminal Construction Kicks Off

The Maritime and Port Authority of Singapore (MPA) has started the construction of a new container terminal at the western end of the island to replace existing

Blacklisted Tanker Returns to Libya's Zawiya Port

A tanker that Libya's rival eastern government had been using to try to export oil in defiance of the Western-backed administration in Tripoli returned to the country on Saturday,

Lerwick Harbor sees Seasonal Boost

The opening of the offshore season in northern waters has seen specialist oil industry vessels return to Lerwick Harbor during April to support subsea development projects.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0767 sec (13 req/sec)