Aberdeen Harbour Completesl Quay Refurbishment

Press Release
Wednesday, May 18, 2011

Aberdeen Harbour Board has announced the completion of a £4 million refurbishment project at Commercial Quay East while welcoming the arrival of a new £1 million workboat.

The reconstruction work at Commercial Quay East began in January 2010, with main contractor, McLaughlin and Harvey Ltd working alongside Glasgow-based consultant engineering firm Jacobs’, to undertake a varied programme of works.

The project, part of Aberdeen Harbour Board’s £65 million development plan, included refurbishing the quay’s existing, 170-metre-long wall, before installing replacement shipping water points, rainwater drainage system and ducts for possible future services. The quay is now fit for purpose for the demands of today’s cargo handling equipment and cargoes. It has since been deepened to 7.5 metres. This will allow the port a greater degree of flexibility and enable the harbour to support larger projects including land based and offshore renewable energy.

Aberdeen’s Harbour’s continued investment was also demonstrated with the recent arrival of a new, 14-metre-long workboat, Sea Herald.

Designed by Macduff Ship Design and built by Macduff Shipyards, it is equipped with a range of features, including a multi-beam hydrographic survey suite, deck crane, twin 350hp engines giving a speed of 9.6 knots and bollard pull of 9.5t, which will enable it to undertake a variety of tasks; from debris removal and bed levelling work to hydrographic surveys and occasional pilot duties.

Engineering director, Ken Reilly, said: “As part of our development strategy, the refurbishment of Commercial Quay East is just one part of the larger vision we have for Aberdeen Harbour in maintaining the high level of service we currently provide for our customers.

“The harbour is an integral part of the North-east’s infrastructure and continued investment, whether it be for the refurbishment of facilities or the provision of new vessels such as the workboat, will cement our reputation as being the centre of activity for the energy industry’s marine operations in North-west Europe.”

Ray Shaw, operations director and harbour master at Aberdeen Harbour, added: “It is important for us to continue to provide the best service and facilities for our customers. The new vessel will make an important contribution to harbour activities and demonstrates our commitment to ensuring Aberdeen Harbour remains one of the UK’s busiest and most efficient ports.”

Source:  www.aberdeen-harbour.co.uk

Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Retailers Well Stocked as Holidays Approach

Import cargo volume at the nation’s major retail container ports is expected to increase 3.3 percent this month over the same time last year as retailers make final

Commodities See Biggest Price Jump in 3 Years

Commodities jumped on Friday, headed for their largest weekly gain in more than three years as base metals roared higher after Glencore pledged to slash zinc output

Chevron Cylinder Oil Gains NOL from Wärtsilä

Chevron Marine Lubricants’ 100BN cylinder oil, Taro Special HT 100 has received approval for its use in another engine range – products made by Winterthur Gas & Diesel Ltd.

Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1560 sec (6 req/sec)