GL Garrad Hassan Releases New Version of Bladed

Press Release
Monday, March 18, 2013
Photo: GL Garrard Hassan

GL Garrad Hassan has released Version 4.4 of Bladed, the industry standard integrated software package for the design and certification of onshore and offshore wind turbines. The release of Version 4.4 represents a significant milestone for Bladed, with many new features, including a new pitch actuator model with additional functionality, a new external controller interface, improved moorings capability for floating turbines, and several updates to the hardware test module. Celebrating its 20th birthday this year, Bladed continues to respond to the needs of the industry by developing features that are important in the design and analysis of today’s modern turbines.
 
Based on a multibody dynamics system and with a rigorous formulation of the aerodynamics, electrical systems, control systems, wind and sea state environments, Bladed offers wind turbine and component manufacturers, design consultants and research organizations a validated and reliable design tool.
 
This latest release of Bladed includes numerous updates, particularly to the pitch actuator modeling, which now includes such additional features as setpoint trajectory planning, limit switches, end stops and variable torque limits. A new interactive user interface screen also provides a clearer description of the model and options available. 
 
As well as the pitch actuator modeling, this release also sees the introduction of a new interface between the simulation code and the external controller, making it more straightforward and clearer to write controllers that utilize a large number of variables and options.
 
The floating capability has also been enhanced by the addition of a tool that allows the user to auto populate the stiffness matrix that represents a catenary mooring line from some basic line properties. This, along with a number of additional updates improves the functionality and usability of the software.

www.gl-garradhassan.com
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

MSC Invests in TRAXENS Container Monitoring

MSC Mediterranean Shipping Company has reached an agreement to back French start-up TRAXENS, a developer of cargo logistics solutions and creator of a container monitoring and coordination system.

B&G Software Upgrade for Zeus2 and Vulcan Chartplotter

B&G, the world’s leading sailing navigation and instrument specialist has upgraded its latest software for the full range of Zeus2 and Vulcan chartplotters. The

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Software Solutions

Two DNV GL Approvals for GTT Training Software

GTT Training, a GTT subsidiary dedicated to training liquefied natural gas (LNG) professionals and to the development of associated simulation tools, has obtained

B&G Software Upgrade for Zeus2 and Vulcan Chartplotter

B&G, the world’s leading sailing navigation and instrument specialist has upgraded its latest software for the full range of Zeus2 and Vulcan chartplotters. The

US Navy Tests Latest Aegis Weapon System

The U.S. Navy conducted a series of cooperative air defense test exercises with the Spanish navy that culminated in live missile firing events using the latest Aegis Weapon System baseline July 20-21.

Offshore Energy

Eni Cancels Vessel Deal with Viking Supply Ships

Viking Supply Ships A/S (VSS) has received an early termination notice of the contract for the Ice-class 1A AHTS “Njord Viking”. The vessel has been working for

MOL Signs Long-Term Charter with Uruguayan JV for FSRU

Japanese shipping company Mitsui O.S.K. Lines, has, through its wholly-owned subsidiary Lakler S.A., agreed to conclude a charter contract with Gas Sayago, for

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1246 sec (8 req/sec)