GL Garrad Hassan at EWEA 2011: Measuring Wind Turbine Reliability - Results of the Reliawind Project

Wednesday, March 09, 2011

Hamburg/Germany, Bristol/UK, 9 March 2011 - Over the last three years, the EU funded Reliawind Project has been conducting research to improve the reliability of wind turbines. In his presentation at EWEA 2011 in Brussels, Michael Wilkinson, GL Garrad Hassan, gives insights to the results of the Reliawind Project.

The presentation will be held on Wednesday, 16.03.2010, from 9:00 - 10:30 at EWEA.

One of the reasons for this project was to better understand reliability by measuring the failure rate and downtime of existing machine designs at operational wind farms. Reliability is of interest to turbine manufacturers and owners, and the project has included data provided by both.

The objective has been to accurately measure reliability using all the data available from modern turbines. These data sources include 10-minute average SCADA, automated fault and alarm logs, work orders, service reports and O&M contractor reports. These sources are often not connected and have usually not been collected in such a way as to allow the easy interpretation for reliability measurement.

The primary strategy of the Reliawind work has been to develop common standards and rigorous, structured methods. To classify the components of different manufacturers' turbines in a generic fashion, a turbine taxonomy has been developed. This describes the turbine in terms its of Systems, Sub-Systems, Assemblies, Sub-Assemblies and Components. The discrete data sources have been connected and processed into a common database format to allow all downtime events to be identified and tagged according to the standard taxonomy. The result is a large dataset comprising an exhaustive list of downtime events.

The reliability has been measured by the derivation of Reliability Profiles, which illustrate how the failure rate and downtime is divided between the different taxonomic items.

The Reliawind project is now concluding and the new work presented will discuss the experience gained by the project partners and demonstrate the project's final results. This will include a demonstration of systems and methods employed. A comparison with other public sources of reliability information will also be presented and the similarities and differences will be described. The results will include data from multiple manufacturers in different operating regimes and it will be possible to discuss the results in some detail. GL Garrad Hassan is also involved in the "Improving Wind Turbine Reliability" side event at EWEA: http://www.ewec2011.info/conference/side-events/improving-turbine-reliability/
 

Source: GL Garrad Hassan

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

Clarksons PLC Perform Strongly in 1H 2014

Leading shipping services group, Clarksons PLC reports strong strong financial performance in the first half of 2014. Financial Results Clarksons increased revenues by 25% to £111.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1358 sec (7 req/sec)