Russian Research Ship Readies for Float

Press Release
Monday, June 04, 2012
'Yantar' Photo credit Yantar Shipyard

Research ship 'Yantar' has left covered workshop of JSC Yantar Shipyard and has beeb moved to open slipway

Research ship Yantar is the lead Project 22010 oceanographic vessel developed by Almaz Central Design Bureau. The ship was laid down on July 8, 2010 on the 65-th anniversary of Yantar Shipyard and named after it. The orderer was obtained from the Russian Defense Ministry. According to the contract, the ship is to be delivered in 2013.

The hull of Yantar has been completely shaped; most of general-purpose equipment, rudder propellers, and lateral thrusters have been installed. Shipwrights continue the construction of the superstructure and fitting of internal equipment.

Before the ship is launched, the yard's staff and contracting organizations will have to install all basic equipment and start to lay feeder mains, to assemble pipelines, and to insulate premises.

Although moving of the 2,000-ton hull took less than an hour, it needed thorough preparation. The hull was placed at a pre-launch position to be put afloat in Aug 2012.



 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

FIO’s New Research Vessel Enters Build Phase

The 78’ research vessel designed and engineered by Boksa Marine Design (BMD) in 2015 is headed to the building phase beginning in June.   BMD contracted with

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Maritime Future Summit: Digital Shipping

Autonomous ships, smart on-board systems: At the Maritime Future Summit on September 5, industry leaders will discuss the future of shipping. For the first time

Marine Science

FIO’s New Research Vessel Enters Build Phase

The 78’ research vessel designed and engineered by Boksa Marine Design (BMD) in 2015 is headed to the building phase beginning in June.   BMD contracted with

Wood Group Develops Advanced Analytics Capability with CeADA

Wood Group today announced that it is collaborating with the Centre for Applied Data Analytics (CeADAR), located at University College Dublin (UCD), to launch a

Report on Health of Seagrass in Cleveland Bay

Port of Townsville Limited (POTL) has released the 2015 Annual Seagrass Health Survey carried out in Cleveland Bay during 2015. The survey, commissioned annually since 2007 at a cost of around $70,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0716 sec (14 req/sec)