Russian Research Ship Readies for Float

Press Release
Monday, June 04, 2012
'Yantar' Photo credit Yantar Shipyard

Research ship 'Yantar' has left covered workshop of JSC Yantar Shipyard and has beeb moved to open slipway

Research ship Yantar is the lead Project 22010 oceanographic vessel developed by Almaz Central Design Bureau. The ship was laid down on July 8, 2010 on the 65-th anniversary of Yantar Shipyard and named after it. The orderer was obtained from the Russian Defense Ministry. According to the contract, the ship is to be delivered in 2013.

The hull of Yantar has been completely shaped; most of general-purpose equipment, rudder propellers, and lateral thrusters have been installed. Shipwrights continue the construction of the superstructure and fitting of internal equipment.

Before the ship is launched, the yard's staff and contracting organizations will have to install all basic equipment and start to lay feeder mains, to assemble pipelines, and to insulate premises.

Although moving of the 2,000-ton hull took less than an hour, it needed thorough preparation. The hull was placed at a pre-launch position to be put afloat in Aug 2012.



 

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

Imabari Bags Order for 11 ULCCs

Imabari Shipbuilding Co., Ltd. (Imabari), with the cooperation of Marubeni Corporation, has secured newbuilding order for eleven (11) units of 20,000TEU Ultra-Large Container Carriers,

Hogan Named VP at Newport News Shipbuilding

Rob Hogan has been appointed vice president of manufacturing at the Newport News Shipbuilding division of Huntington Ingalls Industries (HII), the company announced.

Marine Science

IMTRA LED For Vessel Control System Integration

IMTRA, the leading manufacturer and importer of quality marine products, through its integration-focused design philosophy, created its entire range of 2- and

Investment Impact in Inland Waterways System

The National Waterways Foundation (NWF) has commissioned and released a two-year, ground-breaking study by the University of Tennessee and the University of Kentucky,

Coast Guard Cutter William Trump Commissioned

The Coast Guard Cutter William Trump was commissioned during a ceremony at Coast Guard Sector Key West Saturday Jan. 24, 2015. The Trump is the 11th fast response cutter in the Coast Guard fleet.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2899 sec (3 req/sec)