U.S. Beached Tsunami Dock to be Salvaged

NOAA
Wednesday, March 13, 2013
The Japnese Dock: Photo credit National Park Service

Swept away during the Japan tsunami of March 11, 2011, the steel, concrete, & foam dock beached at Olympic National Park, Wash. is to be removed at last.

On December 18, 2012, the dock beached along the boundaries of Olympic National Park and NOAA’s Olympic Coast National Marine Sanctuary in Washington state.

NOAA has contracted a local salvage company in Washington to complete the removal efforts by early April. The contracted company will work with the Sanctuary, Park Service, and local partners in Washington to remove the dock by helicopter after dismantling it on site. This was determined to be the safest and most efficient method for removal.

Weighing approximately 185 tons, the dock is 65 feet long, 20 feet wide, and 7.5 feet tall. Most of the dock’s volume is Styrofoam-type material encased in steel-reinforced concrete. According to the Washington State Department of Ecology’s website , “The concrete has already been damaged, exposing rebar and releasing foam into the ocean and onto the beach where it can potentially be ingested by fish, birds, and marine mammals. Leaving the dock in place could result in the release of over 200 cubic yards of foam into federally protected waters and wilderness coast.”

The cost of removing the dock is being covered by NOAA’s Office of National Marine Sanctuaries, the National Park Service, and part of the $5 million fund Japan gifted to the U.S. for tsunami debris cleanup.

Remembering a tragedy
Beginning on March 11, 2011, the earthquake and resulting tsunami along Japan’s eastern coast claimed nearly 16,000 lives, injured 6,000, and destroyed or damaged countless buildings. As a result of the disaster, NOAA expects a portion of the debris that the tsunami washed into the ocean, such as this floating dock, to reach U.S. and Canadian shores over the next several years.
 


 

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Huisman Cranes for New Maersk Subsea Support Vessels

In December 2014, Huisman secured a contract from COSCO (Dalian) Shipyard for the delivery of four customized 400mt Rope Luffing Knuckle Boom Cranes and two 100mt

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

Salvage

ASA Mission Statement Revised to Expand Reach

The American Salvage Association has revised its mission statement to increase its area of influence beyond North America, complemented by a new logo that reflects the expanded direction.

26-year Jail Term Sought for Concordia Master

An Italian prosecutor asked a court on Monday to sentence the captain of the Costa Concordia cruise liner to more than 26 years in jail for his role in the 2012 disaster that killed 32 people.

Towing Vessel Sinks off Oahu

A 95-foot towing vessel, Nalani, sank approximately two and half miles west of Barbers Point Harbor, Oahu, Thursday, the U.S. (USCG) Coast Guard reported. The 11

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1432 sec (7 req/sec)