RAL, Ausenco Sandwell Team for CG Bid

(Press Release)
Friday, September 23, 2011

One of Canada’s most storied naval architecture firms, Robert Allan Ltd., and Canada’s leading arctic and offshore engineering firm, Ausenco Sandwell, formed a joint venture -— Canada’s Arctic SAGE Team -— to bid for the design of  the Canadian Coast Guard’s new flagship icebreaker.
“Canada’s Arctic SAGE Team brings together the most experienced, skilled and talented team in the world on ice breaker technology,” says Robert Allan Ltd.’s Executive Chairman, Rob Allan. “It includes the top people in Canada who were responsible for designing highly innovative icebreakers for the Beaufort Sea oil boom, those who designed the Polar 8 Icebreaker, and who are now internationally recognized authorities working on the leading edge of international icebreaker design.”
Prime Minister Stephen Harper announced the new icebreaker project in August of 2008. The ship, to be named CCGS John G. Diefenbaker, will replace CCGS Louis S. St-Laurent. It is expected to take eight to 10 years to design and build at a total cost of $720 million.
To create Canada’s Arctic SAGE Team, Robert Allan Ltd. has partnered with Ausenco Sandwell, also based in Vancouver. Key subcontractors within the team include AKAC Inc., R.P. Browne & Associates, Ben Johannsen, Colin Reville, DC Maritime Technologies, and D.F. Dickins and Associates, all internationally acknowledged experts in icebreaker technology. The Glosten Associates of Seattle bring extensive recent experience on the Science Mission aspects of the icebreaker. A corps of highly experienced Canadian Ice Masters—men who have worked throughout the Canadian Arctic in a wide range of icebreaking ships—bring a practical operational perspective to the design group
Allan says this team intimately knows the Canadian Arctic and the ice conditions there, conditions he says are harsher and totally different from any other region in the world.
“This team is simply the very best in the business,” saidAllan. “It is gratifying to see this international expertise is available in Canada today to design the flagship of the Canadian Fleet.”

 

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

MAN GenSets for Chilean Fishing Vessel

MAN Diesel & Turbo received an order for three MAN 6L21/31 gensets to power a wellboat newbuilding for Patagonia Wellboat, the Chilean fish-farming operator. The

Zentech to Perform ZAIMS Work on Brazilian Aircraft Carrier

Zentech’s President Ramesh Maini announced that the company has been awarded a contract to perform an inspection and evaluation of the hull steel for the Naval Aircraft Carrier São Paulo,

LNG Tanker Due in UK Around May 6

Britain's Isle of Grain liquefied natural gas (LNG) import terminal is set to receive the GDF Suez Point Fortin tanker on around May 6, live ship-tracking data on Reuters Eikon shows.

Shipbuilding

Ingalls-built National Security Cutter Completes Acceptance Trials

Huntington Ingalls Industries (HII) announced today that the company's fifth U.S. Coast Guard National Security Cutter (NSC), James (WMSL 754), has completed her acceptance trials.

Willard Adds Sales Manager for Gulf Coast, Florida

Willard Marine, Inc. has hired Jimmy Sorenson as regional sales manager for the Gulf Coast and Florida.   Sorenson served 11 years with the U.S. Coast Guard in

Thoma-Sea Launches US-flagged OSV

Technology Associates, Inc. (TAI) of New Orleans, La., announced that another derivative of a vessel built from TAI’s EnviroMax designs was launched.   Thoma-Sea Marine Constructors,

Naval Architecture

Thoma-Sea Launches US-flagged OSV

Technology Associates, Inc. (TAI) of New Orleans, La., announced that another derivative of a vessel built from TAI’s EnviroMax designs was launched.   Thoma-Sea Marine Constructors,

SENER Develops Multipurpose Subsea Support Vessel

Operators are demanding more efficient, less consuming and more capable vessels, while shipbuilders need to achieve it in a very competitive environment. As a ship design firm,

Willard to Present at High Speed Boat Operations Forum

Willard Marine, a manufacturer of aluminum and fiberglass commercial and military boats, will present at the High Speed Boat Operations (HSBO) Forum in Lisbon, Portugal from May 4-6.

Coast Guard

Ingalls-built National Security Cutter Completes Acceptance Trials

Huntington Ingalls Industries (HII) announced today that the company's fifth U.S. Coast Guard National Security Cutter (NSC), James (WMSL 754), has completed her acceptance trials.

USCG Monitors LNG Carrier Repair in Alaska

The U.S. Coast Guard (USCG) is monitoring repairs aboard the liquid natural gas (LNG) carrier Excel in Homer, Alaska.    The vessel was received an order from

6,800 Migrants Rescued as Med Seas Abate

One of busiest weekends for sea crossings this year. Around 6,800 migrants were rescued from overcrowded boats crossing to Europe over the weekend, including

Arctic Operations

Shell's Arctic Return Faces Hurdle at Seattle Port

Royal Dutch Shell's quest to return to Arctic drilling for the first time in three years could face delays after Seattle ruled that the city's port must apply for

Shell Awaits U.S. Nod, Pushes Ahead in Arctic

Royal Dutch Shell is pushing ahead with plans to explore for oil in the Arctic Ocean near Alaska this summer despite opposition from environmental groups. The

Arctic Whitening Might Help Ice But Not Climate

The attempt to artificially whiten the surface of the Arctic Ocean and offset climate change will not be able to reduce global temperatures substantially. It could

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1572 sec (6 req/sec)