RAL, Ausenco Sandwell Team for CG Bid

(Press Release)
Friday, September 23, 2011

One of Canada’s most storied naval architecture firms, Robert Allan Ltd., and Canada’s leading arctic and offshore engineering firm, Ausenco Sandwell, formed a joint venture -— Canada’s Arctic SAGE Team -— to bid for the design of  the Canadian Coast Guard’s new flagship icebreaker.
“Canada’s Arctic SAGE Team brings together the most experienced, skilled and talented team in the world on ice breaker technology,” says Robert Allan Ltd.’s Executive Chairman, Rob Allan. “It includes the top people in Canada who were responsible for designing highly innovative icebreakers for the Beaufort Sea oil boom, those who designed the Polar 8 Icebreaker, and who are now internationally recognized authorities working on the leading edge of international icebreaker design.”
Prime Minister Stephen Harper announced the new icebreaker project in August of 2008. The ship, to be named CCGS John G. Diefenbaker, will replace CCGS Louis S. St-Laurent. It is expected to take eight to 10 years to design and build at a total cost of $720 million.
To create Canada’s Arctic SAGE Team, Robert Allan Ltd. has partnered with Ausenco Sandwell, also based in Vancouver. Key subcontractors within the team include AKAC Inc., R.P. Browne & Associates, Ben Johannsen, Colin Reville, DC Maritime Technologies, and D.F. Dickins and Associates, all internationally acknowledged experts in icebreaker technology. The Glosten Associates of Seattle bring extensive recent experience on the Science Mission aspects of the icebreaker. A corps of highly experienced Canadian Ice Masters—men who have worked throughout the Canadian Arctic in a wide range of icebreaking ships—bring a practical operational perspective to the design group
Allan says this team intimately knows the Canadian Arctic and the ice conditions there, conditions he says are harsher and totally different from any other region in the world.
“This team is simply the very best in the business,” saidAllan. “It is gratifying to see this international expertise is available in Canada today to design the flagship of the Canadian Fleet.”

 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

EU Regs on Ship CO2 Reporting Complicates IMO Agreement

ICS Concerned that EU will Preempt IMO CO2 Negotiations.   The global trade association for shipowners – the International Chamber of Shipping (ICS) – is disappointed

Asia VLCC Rates Could Could Climb Even More

Owners see rates climb by nearly $22,000 per day; Rates could peak as more tonnage comes free. Rates for very large crude carriers (VLCCs) on key Asian routes

New Players in Singapore Markets in OW's Absence

The downfall of a leading marine fuel supplier that prompted sellers to tighten credit terms in Singapore is skewing the post-OW Bunker jostle for market share

Shipbuilding

World’s Largest Boxship is DNV GL classed

CSCL Globe, the world’s largest containership and the first of a series of five 19,100 TEU containerships ordered by China Shipping Container Lines (CSCL) in 2013,

ESSA's Fleet Upgradation Environmental Driven

State-controlled Exportadora de Sal SA de CV of Mexico ("ESSA"), one of the world’s largest salt exporters with a 10-million-ton annual production, has strengthened

Kleven Wins New Yacht Contract

Norwegian ship builder Kleven has secured a new contract for a high specification, 116-metre long Expedition Support Vessel. The order is placed by Mr Graeme Hart,

Naval Architecture

ESSA's Fleet Upgradation Environmental Driven

State-controlled Exportadora de Sal SA de CV of Mexico ("ESSA"), one of the world’s largest salt exporters with a 10-million-ton annual production, has strengthened

Kleven Wins New Yacht Contract

Norwegian ship builder Kleven has secured a new contract for a high specification, 116-metre long Expedition Support Vessel. The order is placed by Mr Graeme Hart,

Production Begins on Sovcomflot’s New MPSV

Arctech Helsinki Shipyard started production of the new icebreaking multipurpose supply vessel   The production of the icebreaking multipurpose supply vessel

Coast Guard

USCG Medevacs Man From Sailboat off NC Coast

The Coast Guard medevaced an injured 62-year-old man from his sailboat Thursday approximately 100 miles east of Kill Devil Hills. Watchstanders at the Fifth

USCG Suspend Search for Crabber Near Anacortes, Wash.

The Coast Guard has suspended the search for a crabber reported overdue near Anacortes, Wednesday. Dean Harvey, 48, of Bremerton, remains missing. Search

Bollinger Delivers 11th FRC to the US Coast Guard

Bollinger Shipyards, Inc. has delivered the William Trump, the 11th Fast Response Cutter (FRC) to the United States Coast Guard.   The announcement was made by Bollinger Chief Operating Officer,

Arctic Operations

MSC Approves SOLAS Amendments

SOLAS amendments to make IGF Code mandatory approved by Maritime Safety Committee   The International Maritime Organization’s (IMO) Maritime Safety Committee (MSC),

Production Begins on Sovcomflot’s New MPSV

Arctech Helsinki Shipyard started production of the new icebreaking multipurpose supply vessel   The production of the icebreaking multipurpose supply vessel

Strategy Can Maximize UKCS potential

Companies operating in the North Sea require a cultural shift to make the most of the its potential, according to a new report from Deloitte, the business advisory firm.

 
 
Maritime Contracts Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1811 sec (6 req/sec)