Scheldepoort Secures Order for Conversion of Drill Rig

Monday, June 20, 2011

Scheldepoort Repair & Conversion Yard in Vlissingen has signed a contract for the conversion of jack up drill rig "GFS Labrador" into an accommodation rig. The project will commence when the rig arrives in Vlissingen at the end of June and will take approximately 4 months. Among other things the main scope of work is the removal of the complete drilling installation from the rig, such as the 80 meter drilling tower, the sliding piece, cement and mud tanks, all drilling equipment and redundant cabling and piping.

Scheldepoort will build a 400 tons new to be fitted accommodation block which is to be placed on the deck. The current accommodation facilities will be completely refurnished and new life saving equipment will be installed. The rig will be fitted with sponsons in order to comply with stability regulations. In addition a complete survey as well as a painting program will be executed. After delivery the accommodation rig will go into service in the coastal waters of Denmark.

Currently, Scheldepoort is in the final stage of the conversion of McDermott's "Agile" into a flexible pipe layer. The "Agile" will be delivered back to the owner in August after a six month conversion project. \V'ith this new order Scheldepoort further establishes her name in the offshore and conversion market in the North Sea area.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

ASA Mission Statement Revised to Expand Reach

The American Salvage Association has revised its mission statement to increase its area of influence beyond North America, complemented by a new logo that reflects the expanded direction.

New Chemical Handling Service from Ferguson Group

Tank, Fluid Solutions and Bunded Storage for Dangerous Goods and Chemicals Introduced at Gap Ridge, Karratha.    Ferguson Group Australia, global specialist in offshore DNV 2.

BP Freezes Pay in 2015 to Cut Costs

BP is freezing base pay across the group this year, the latest in a series of steps by oil majors to cut costs in response to sinking oil prices.   Over the past year,

Contracts

InterMoor Completes Juniper Mooring Installation Contract

InterMoor has completed a mooring and foundation installation campaign for bpTT’s Juniper gas project offshore Trinidad and Tobago, reportedly the largest foundation

Huisman Cranes for New Maersk Subsea Support Vessels

In December 2014, Huisman secured a contract from COSCO (Dalian) Shipyard for the delivery of four customized 400mt Rope Luffing Knuckle Boom Cranes and two 100mt

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

 
 
Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2651 sec (4 req/sec)