Wärtsilä Win Color Line Scrubber System Contract

MaritimeProfessional.com
Tuesday, June 25, 2013
SuperSpeed 2: Photo courtesy of Wärtsilä

Wärtsilä contracted by Norwegian cruise and ferry operator, Color Line, to retrofit four exhaust gas cleaning systems to the company's 'SuperSpeed 2' Ro-pax ferry.

The contract was signed in June and the installation is expected to be carried out during docking of the vessel in spring 2014.

The four separate Wärtsilä open loop scrubber systems will ensure the ship's full compliance with the International Maritime Organization's (IMO) MARPOL Annex VI regulations, and with EU Directive 2055/33/EC. Furthermore, there is an option to install the Wärtsilä system on three other Color Line vessels as well.

By significantly reducing the emissions of sulphur oxides (SOx) and particulates from the engines' exhaust, the 'SuperSpeed 2' will be able to operate without restrictions in designated Emission Control Areas (ECAs). Wärtsilä is the first manufacturer to have been awarded the IMO certificate for exhaust gas cleaning systems by the classification societies Det Norske Veritas and Germanischer Lloyd.

The Wärtsilä Open Loop Scrubber System
The system operates in an open loop using seawater to remove SOx from the exhaust. Exhaust gas enters the system and is sprayed with seawater in three different stages. The sulphur oxides in the exhaust react with the water to form sulphuric acid. Chemicals are not required since the natural alkalinity of seawater neutralizes the acid.
 
Wash water from the system is treated and monitored at the inlet and outlet to ensure that it conforms with all applicable discharge criteria. It can then be discharged into the sea with no risk of harm to the environment.
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

$55M Berth Upgrade in Townsville Port

Townsville contractor CivilPlus Constructions has been awarded the design and construct tender for the primary wharf works component of Port of Townsville’s $55 million Berth 4 Upgrade project.

Aker Joins Johan Sverdrup Phase 2 Study

Aker Solutions will deliver a concept study on a new processing platform for future phases of the Statoil-operated Johan Sverdrup North Sea field, Norway's largest oil find in three decades.

GTT, DSME Ink Cooperation Deal

GTT, the world leader in the design of membrane containment systems for the maritime transportation and storage of LNG (Liquefied Natural Gas) announces the signature

Marine Propulsion

I-Tech Gets Large Market Recognition of Selektope

Following the approval of Selektope under the EU’s Biocidal Products Regulation, developer I-Tech reports extraordinary uptake for antifouling coatings that include

Meyer Turku Lays Keel of Tallink’s LNG Ferry

The keel of the Tallink’s new LNG-powered fast ferry Megastar was laid at the Meyer Turku shipyard   The hull assembly of Tallink’s new fast ferry Megastar started

Cummins Connected Diagnostics Available with Geoteab

Geotab, a telematics engineering company, and Cummins Inc., an  independent manufacturer of diesel and natural gas engines, controls and emission solutions, has

 
 
Maritime Careers / Shipboard Positions Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0807 sec (12 req/sec)