Upgraded Self-unloader Systems are Clean and Efficient

Press Release
Tuesday, May 03, 2011

Cargotec has introduced new developments that allow shipboard systems for gravity self-unloading dry bulk cargoes to deliver greater capacity while minimising environmental impact

Cargotec has enhanced its MacGregor bulk cargo gravity unloading system with two new developments: a space-saving gate under the hold, and a fully enclosed boom conveyor. "MacGregor gravity self-unloading belt conveyor systems for bulk carriers benefit from over 50 years of development and operational experience but, as in all areas of its activities, Cargotec continues to refine and improve the concept," Sales Director Johan Ericson says.

MacGregor Full Flow Gate

Cargo gates are the first element of a ship's gravity unloading system, and allow the cargo to fall on to the conveyor belt running below the cargo holds in a controlled manner. As part of its continuing R&D investment, Cargotec has developed the MacGregor Full Flow Gate. Its wide gate opening generates increased cargo capacity and increased discharge rates while minimising material flow disruptions. The new gate can handle a variety of cargoes including coal, iron ore, gypsum rock and aggregates.

Anders Bäckström, Senior Mechanical Engineer, says "Cargotec has developed a gate with a high cargo handling capacity without compromising on hull space. The more space occupied by the gates and conveyors, the less there is available for the revenue earning cargo.  Thanks to careful placing of the gate control machinery, the MacGregor Full Flow Gates require much less space than traditional gates."

MacGregor Closed Boom

The boom conveyor is the final element of a ship's bulk self-unloading system, transferring the cargo to a shore based or marine facility. Up to now, boom conveyors have been equipped with conveyor covers, water spray nozzles and dust collectors to reduce spillage and keep dust emissions to a minimum.

"Modern requirements are for dust-free operations for the benefit of crew, stevedores and the local environment," says Tomas Wallin, Technical Director.  "The total enclosure of the MacGregor closed boom results in a truly dust-free operation, but the benefits do not end there.

"Thanks to its ingenious design, the MacGregor Closed Boom has an optimal support structure with a smooth upper surface to prevent ice formation and a smooth inner bottom surface to enable easy cleaning. Service and inspection is also much easier and safer than with a traditional system." There are walkways alongside the belt, allowing safe and easy access to the equipment within the walls of the boom.

The new boom will benefit from an increased product life span because the components are well protected against the external elements.

 Source: Cargotec

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Bulk Carrier Trends

Golden Ocean and Knightsbridge Complete Merger

The merger between Knightsbridge Shipping Limited and Golden Ocean Group Limited was approved today at special meetings of both companies' shareholders.      The new company,

Baltic Sea Freight Index Flat on Muted Vessel Activity

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, remained steady on Thursday due to a muted vessel activity.

Liebherr Opens African Maritime Hub

Liebherr Maritime Cranes celebrated the grand opening of the new sales and service center in Durban, South Africa. The new African maritime hub was opened by a

Marine Equipment

Carnival to Add Nine Ships to Cruise Fleet

Carnival Corporation enters into strategic partnerships to add nine cruise ships to its fleet over a four-year period starting in 2019; shipbuilders Fincantieri

Ecochlor Presents BWTS Case Study at CMA

Ballast water treatment technology developer Ecochlor Inc. presented a project case study yesterday at CMA Shipping 2015 in Stamford, Conn. The case study covered

SAL Heavy Lift Performs Offshore Windfarm Work

MV Lone proves as project platform for Wikinger wind farm   SAL Heavy Lift informs it has completed the second phase of the Wikinger Pile Testing Campaign with DP II Class vessel MV Lone.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2331 sec (4 req/sec)