Engine Damage Knocks Ferry Out of Service

Press Release
Sunday, November 11, 2012
File Propulsion Machinery Damage
Propulsion Machinery Damage 'Walla Walla': Photo credit WSDOT

Washington State Ferry 'Walla Walla' suffers part engine meltdown in shiprepair yard putting it out of service indefinitely.

A failure in one of the drive motors on the 188-car ferry, Walla Walla, has left parts of the ferry near the engine melted and charred, and the vessel is inoperable and out of service indefinitely. The incident happened while the vessel was in for routine, regularly scheduled maintenance work on Sunday, Nov. 4, 2012; work which included inspection of electrical drive motors, overhauling the boiler and pre-checks for U.S. Coast Guard annual inspections.

The Walla Walla will be out of service for at least the next few months while crews work to repair the vessel. The drive motor that was damaged is one of four motors that turn the propellers.

Immediately following the incident, the Washington State Department of Transportation Ferries Division started an internal investigation per standard protocol. Preliminary findings indicate that there was no explosion.

“This is a serious incident and we’re going to do a very thorough and detailed investigation into what happened,” said David Moseley, WSDOT assistant secretary, ferries division. “We hope to return the vessel to service as soon as possible.”

Due to the severity of the damage, the investigation has been elevated to a third party contractor, Cadick Corporation. They will be assisted by WSDOT ferries division’s senior port engineers, safety systems managers, and electrical engineers. WSDOT has also reached out to the Department of Labor and Industries and the U.S. Coast Guard for assistance to ensure that all employee safety requirements were met. Detailed results of the investigation are expected within two to three weeks.

Ferry vessels will be shifted throughout the system in an effort to maintain service for passengers while the Walla Walla is unavailable.

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

New Operations Manager at SENER

Rafael Martínez-Abarca was appointed Operations Manager of the Marine Strategic Business Unit (MaSBU) of SENER, an engineering and technology group that has a workforce of about 5,

WSS Offers Free Welding Safety Inspections

Wilhelmsen Ships Service (WSS) is currently running a campaign to promote safe onboard welding across the Asia Pacific region. The Welding Safety Inspection Service,

Newpark Drilling Fluids Opens New World Headquarters

Newpark Drilling Fluids, a wholly-owned subsidiary of Newpark Resources, has opened its new world headquarters and laboratory facility in Katy, Texas. Newpark Drilling

Ship Repair & Conversion

GLTT to Receive WIRE-Net Mission Builder Award

WIRE-Net has selected The Great Lakes Towing Company and Great Lakes Shipyard as one of the four local manufacturing companies to receive this year’s Mission Builder Awards.

BAE Gets Navy Contract for USS Arlington

The Department of Defense awards a Navy contract for work on LPD 24 to BAE Systems, Norfolk, Va. BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded a $22,

Harkand Appoints Chief Financial Officer

Harkand, the international subsea inspection, repair, maintenance and light construction group, has appointed Deborah Stevenson as the company’s new chief financial officer.

Ferries

Philippine Navy Search for Ferry Survivors

Philippine navy divers battled strong ocean currents in a desperate hunt for seven missing passengers of a ferry that sank with dozens on board. The Lady of

P&O Superferry Twins Refit and Return to Service

P&O Ferries’ superferry twins, European Highlander and European Causeway which operate between Cairnryan and Larne, have returned to service following a £100,000 refit on each ship.

Concordia Baby to See Mother(ship) for the First Time

Concordia Baby, the latest vessel to be completed by specialist workboat builder Alnmaritec, is heading to the Falkland Islands to be installed onto the mother ship M/V Concordia Bay.

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright