Marine Link
Thursday, March 28, 2024
SUBSCRIBE

Electricity News

25 Mar 2024

US Dredging: Plenty of Issues, New WRDA on the Way

(Photo: Janet Meredith / U.S. Army Corps of Engineers)

2024 marks another year for development of a biennial WRDA bill—Water Resources Development Act, critical legislation for the Nation’s waterways, ports and harbors. WRDA encompasses a range of issues, from environmental regs to energy use to agriculture and, of course, a focus on projects critical for economic growth.Because these are dynamic and timely issues, Congress and the maritime sector like to keep WRDA on a two-year reauthorization timeline. Indeed, the House Transportation & Infrastructure Committee, December and January, held three WRDA information hearings.

25 Mar 2024

BOEM Announces Review of Proposed Vineyard Northeast Project

Source: BOEM

The US Bureau of Ocean Energy Management (BOEM) will initiate an environmental review of Vineyard Northeast’s proposed offshore wind energy project, located 29 miles offshore Nantucket, Massachusetts at its closest point. BOEM estimates the proposed project would generate up to 2,600MW of electricity, enough to power more than 900,000 homes with clean renewable energy. The approximately 132,370-acre Lease Area is located some 29 miles (mi) from Nantucket and approximately 39 mi offshore Martha’s Vineyard…

14 Mar 2024

NYK and Astomos Energy Christen New Jointly-Owned Dual-Fuel LPG Carrier

Gas Garnet vessel (Credit: NYK)

As their first jointly owned liquefied petroleum gas (LPG) carrier in 21 years, NYK and Astomos Energy have named the new vessel Gas Garnet.The companies held a naming ceremony at the Sakaide Works of Kawasaki Heavy Industries on March 1, 2024.The 86,953 m3 capacity vessel was christened Gas Garnet by Yoshihito Takahashi, senior executive officer of Astomos Energy. This is the first jointly owned LPG vessel by the companies after they shared ownership of Gas Capricorn from 2003.The vessel has a breadth of 37.2 meters…

11 Mar 2024

Strategic Marine Delivers Support Vessel for Yunlin Offshore Wind Farm

Support vessel for Yunlin offshore wind farm (Credit: Strategic Marine)

Singapore’s Strategic Marine and Taiwan’s Prosperous Wind Shipping have delivered the hybrid-ready support vessel for the Yunlin offshore wind farm in Taiwan.The StratCat 27 hybrid-ready vessel is designed for the transfer of technicians and cargo, essential for the construction, operation, and maintenance of offshore wind farms.Owned and operated by Prosperous Wind Shipping, the vessel will be able to meet the specific needs of the offshore wind industry in Taiwan.Set to start operations at the Yunlin offshore wind farm in April 2024…

10 Mar 2024

Norway Offers $193 Million Funding to Arctic Floating Wind Farm Project

© Marc Dyck / Adobe Stock

A floating offshore wind farm planned in Arctic waters on Friday received 2 billion Norwegian crowns ($193 million) in state funding, with Norway viewing the still costly technology as a key contributor for industry development and emission cuts.The GoliatVind project in the Barents Sea, consisting of five 15 megawatts turbines and seeking to supply power to the Arctic town of Hammerfest, beat out six other applicants in a tender by government agency Enova.Norway hopes that floating offshore wind will provide an industrial future for its offshore supply industry as well as a means of cutting e

01 Mar 2024

US Offshore Wind: Down but Not Out

© Eric Dale Creative / Adobe Stock

“The winds of change are blowing wild and free.” – Bob DylanIn the U.S. offshore wind industry, developments over recent months have placed an exclamation point on the word “wild”. Yes, the wind still blows “free”, but mounting challenges have proven that harnessing its power offshore is anything but. In fact, far from it, as rising materials costs, high interest rates, labor shortages and supply chain delays, among other issues, have delivered heavy blows to the commercial viability of several projects.

26 Feb 2024

Will 2024 Settle the Turbulence of US Offshore Wind?

(Photo: Avangrid)

There is no denying that 2023 was a challenging year for the U.S. offshore wind market. Citing macroeconomic factors including high inflation, rising interest rates, and supply chain bottlenecks, Ørsted announced on October 31 that they were ceasing the development of the Ocean Wind 1 and Ocean Wind 2 projects, which were scheduled for construction off the coast of New Jersey. Unfortunately, the troubling news has continued into the new year, with Equinor and BP announcing on…

23 Feb 2024

Three Questions: Matt Tremblay, VP, Global Offshore Markets, ABS

Matt Tremblay, ABS’ Vice President of Global Offshore Markets. Image courtesy ABS

The American Bureau of Shipping dominates the global market in the classification of Floating Production. Offshore Engineer recently sat with Matt Tremblay, ABS’ Vice President of Global Offshore Markets, at American Bureau of Shipping HQ in Houston for his insights on market drivers and technical trends in this dynamic market.Matt, big picture, how do you see the Floating Production market developing in the coming years?At a macro level, I think we're going to be supply limited over the next five years.

22 Feb 2024

Dominion Partners with Stonepeak to Fund Coastal Virginia Offshore Wind

(Photo: Dominion Energy)

U.S.

21 Feb 2024

Yantai Dual-fuel Methanol WTIV Design Receives ABS Approval

Illustration of the wind turbine installation vessel (WTIV) design (Image: Yantai CIMC Raffles Offshore Ltd.)

Classification society ABS reports it has issued approval in principle (AIP) to Chinese shipbuilder Yantai CIMC Raffles Offshore Ltd. for its design of a dual-fuel methanol, heavy-duty, offshore wind turbine installation vessel (WTIV).The WTIV is capable of transporting and installing the largest wind turbines in the world, those capable of producing up to 20 megawatts (MW) of electricity, and promises to reduce carbon emissions with its dual-fuel methanol propulsion system. The design also features a 3…

21 Feb 2024

Maine Selects Sears Island as Preferred Site for Floating Wind Port Facility

© creativenature.nl / Adobe Stock

The government of Maine has selected a section of state-owned area on Sears Island as its preferred site for a port facility development that will support the floating offshore wind industry.The selection of the site, announced by the Governor of Maine Janet Mills, follows an extensive public stakeholder process led by the Maine Department of Transportation and Maine Port Authority to consider the state’s primary port development options, including multiple potential sites in the Port of Searsport…

15 Feb 2024

Jumbo Offshore Awarded Monopile Removal Contract in Taiwan

Source: Jumbo Offshore

Jumbo Offshore has been awarded a contract by Yunneg Wind Power Co. (YWPC) for the removal of monopiles at the Yunlin Offshore Wind Farm in Taiwan.The contract award represents an expansion of the company’s existing scope, which has involved transport and installation of the project’s transition pieces.Under the amendment, some monopiles, which were installed during an earlier project phase, are to be removed approximately 3m below mean seabed level. To undertake this scope, Jumbo…

14 Feb 2024

HAROPA Begins Work on Shore Power Connections at Le Havre Cruise Terminal

(Credit: VINCI)

HAROPA PORT has started working on the construction of electricity supply connections for ships at the Le Havre cruise terminal.The purpose of the work planned for HAROPA PORT’s cruise terminal, dubbed Florida Point, is to assist the energy transition in the sea cruise sector, which goes in line with the port’s strategic project decarbonize its activities.Each supply outlet will be capable of providing up to 13 MW, subject to a maximum of 30 MW (or the equivalent of the power required to supply 5…

13 Feb 2024

US Finalizes Two Offshore Wind Energy Areas in Oregon

BOEM has designated two final Wind Energy Areas (WEAs) off the Oregon coast, the Coos Bay WEA is 61,204 acres and  located approximately 32 miles (mi) from shore. The Brookings WEA is 133,808 acres and  approximately 18 mi off the coast. If fully developed, the Final WEAs could support 2.4 GW of energy production. (Image: BOEM)

The Bureau of Ocean Energy Management (BOEM) on Tuesday finalized two wind energy areas (WEAs) in the offshore Oregon region, aligning with government goals to deploy 30 gigawatts of offshore wind power along U.S. coastlines this decade to fight climate change.The two WEAs, Coos Bay WEA and Brookings WEA, are spread across 195,012 acres (78,919 hectares) and "the department continues to take steps to evolve its approach to offshore wind to drive towards union-built projects and a domestic-based supply chain," said the agency, which is part of the U.S.

09 Feb 2024

US to Establish National Offshore Wind Center of Excellence

© Andriy Sharpilo / Adobe Stock

The U.S. Department of Energy (DOE) has set out plans to invest $4.75 million to establish a new national center of excellence to accelerate offshore wind deployment across the United States.The Academic Center for Reliability and Resilience of Offshore Wind (ARROW), led by the University of Massachusetts Amherst with approximately 40 partners, will focus on workforce development, targeted research, and partnerships and strategies to advance offshore wind development.As offshore…

06 Feb 2024

Wind Power Outpaces Gas Plants in Europe

© New Africa / Adobe Stock

Wind power production outpaced gas plants in Europe for the first time last year as fossil fuel electricity generation plummeted, cutting the region's carbon emissions, data from think-tank Ember showed.Europe is ramping up its renewable electricity generation as part of efforts to wean the bloc off Russian fuels and to help meet its climate goal of net zero emissions by 2050.Europe's fossil fuel power generation fell by a record 19% year-on-year in 2023, with gas-fired electricity production down 15% and coal electricity production down 26% the report by Ember showed.At the same time wind pow

05 Feb 2024

Researchers Warn on Eutrophication Potential of Ammonia

Source: Chalmers University of Technology

Switching to ammonia as a marine fuel could create new problems, according to a new study undertaken by researchers from Chalmers University of Technology in Sweden.The researchers carried out life cycle analyses for batteries and for three electro-fuels (hydrogen, methanol and ammonia). Eutrophication and acidification are some of the environmental problems that can be traced to the use of ammonia – as well as emissions of laughing gas (N2O), which is a very potent greenhouse gas.Ammonia (NH3) is a carbon-free fuel and has the advantage of a higher energy density than, for example, hydrogen.

02 Feb 2024

North Star to Deliver Hybrid-Electric SOV for German Offshore Wind Farm

North Star's new SOV (Credit: North Star)

North Star has secured a contract with energy utility giant EnBW to deliver a new hybrid-electric service operations vessel (SOV) on a decade-long minimum charter to service the He Dreiht wind farm off the coast of Germany.The agreement marks the company’s first offshore wind move outside the UK market, a milestone mark in its ambitious European growth strategy to add 40 new SOVs to its fleet by 2040.The newbuild is of VARD 407 design which has been tailored to meet EnBW’s specific…

25 Jan 2024

Japan Takes the Lead on Ammonia as Maritime Fuel

Image courtesy NYK

Late last year Japanese maritime leaders – Nippon Yusen Kabushiki Kaisha (NYK), Japan Engine Corporation, IHI Power Systems Co., and Nihon Shipyard Co., Ltd. – signed a series of contracts to buid the world's first ammonia-fueled medium gas carrier (AFMGC) equipped with Japan-make engines. The target is a completed ship by November 2026.While the project is significant, hurdles remain, namely:While development work is underway, today there is not yet a dual-fuel ammonia engine on the market…

25 Jan 2024

Jan De Nul Reels In Ørsted’s Hornsea 3 Export Cable Job

Connector CLV (Credit: Jan De Nul)

Belgium-based offshore installation contractor Jan De Nul has signed the export cable contract with Ørsted for its 2.9 GW Hornsea 3 offshore wind farm in the U.K.Jan De Nul will be responsible for the seabed preparation, transport, installation and protection of 350 km of DC export cables connecting the wind farm to the U.K. electricity grid.For the installation and protection of the DC export cables, the company is going to deploy several vessels.Cable-laying vessels Isaac Newton and Connector will transport and install the cables…

24 Jan 2024

New Jersey Approves Two Giant Offshore Wind Power Projects

© Global Image Archive / Adobe Stock

New Jersey's utility regulator on Wednesday approved two offshore wind power projects with a combined capacity of 3,742-megawatts (MW) whose backers include Invenergy and TotalEnergies.The offshore wind industry is expected to play a major role in helping several states and U.S. President Joe Biden meet goals to decarbonize the power grid and combat climate change.But progress was slow last year after offshore developers canceled contracts to sell power in Massachusetts, Connecticut and New Jersey…

23 Jan 2024

Offshore Wind Vessels Charging Study Gets Underway in Irish Sea

(Credit: Stillstrom)

Maersk’s offshore vessel-charging venture Stillstrom has launched a collaborative study with EnBW and BP, the developers of the Morgan and Mona offshore wind farms, to assess the viability of integrating offshore charging solutions for service and crew transfer vessels for the two projects.The study will evaluate the operational, technical, and economic viability of integrating offshore charging solutions for Service Operation Vessels (SOVs) and Crew Transfer Vessels (CTVs) into…

19 Jan 2024

Yankee Freedom Orders New Passenger Ferry for Dry Tortugas National Park

(Image: Incat Crowther)

Key West, Fla.-based Yankee Freedom has ordered a new 300-passenger, high-speed catamaran from Gladding-Hearn Shipbuilding, Duclos Corporation for passenger service between Key West and the Dry Tortugas National Park. The new vessel will replace Yankee Freedom III, a 250-passenger catamaran built for the 70-mile run by the Mass.-based shipyard in 2012. Delivery of Yankee Freedom IV is planned for 2026.The new larger vessel, designed by Incat Crowther, retains the strong brand presence Yankee Freedom has established with tourists to the national park, said company officials.