Irving Shipbuilding Embarks on AOPS Design Stage

Press Release
Monday, March 11, 2013
Shipyard Ministerial Visit: Photo credit Irving

Canadian Government ministers attend the shipyard to mark start of work on the design of new Arctic Offshore Patrol Ships (AOCS).

Irving Shipbuilding welcomed the Honourable Rona Ambrose, Minister of Public Works and Government Services Canada, and the Honourable Peter MacKay, Minister of National Defence to Halifax Shipyard today to mark the start of the Definition (Design) phase of work for the first set of new naval combat vessels for Canada, the Arctic Offshore Patrol Ships (AOPS).

Under the Definition Contract Irving Shipbuilding will refine and complete the AOPS vessel design to the high degree of detail for Canada and for those who will cut steel, assemble, complete and test the ships, as well as complete various phases of design review, analysis and testing, plan how to integrate all of the complex systems and equipment on the ship, and do detailed cost estimates for the build phase of the project; all tasks required in order to be ready to start the build of the AOPS vessels in 2015 and to meet Canada’s specifications.

“Our focus over the next 30 months is on producing a detailed ship design that delivers best value to Canada, while ensuring we meet the government’s 2015 deadline to cut steel for the first ship – this is vital to our customer, our current workforce and their families,” said Ross Langley, Vice Chairman of Irving Shipbuilding.

The Definition Contract will be managed by a team of highly-skilled, well paid professional positions located in Halifax, developing combat shipbuilding design and planning capacity and experience in Nova Scotia.  This team will manage the many specialist subcontractors and material suppliers, as well as the integration of the various complex systems that make up each ship. Recruitment for this team of engineers, supply chain leaders, program managers and technical specialists has been underway for some time now.  It is anticipated this team will reach a peak of 90 professionals in the Spring of 2014.
Completion of a test production module to verify design, engineering and systems integration plans will allow for more efficient production of the ships and employ an estimated 110 additional workers, bringing the Irving Shipbuilding AOPS team to 200.  Eighty percent of the high-value jobs associated with the AOPS design contract will be in Canada (including Tier 1 suppliers).

As Canada’s Prime Contractor for the AOPS project, Irving Shipbuilding has selected a team of exceptional, experienced subcontractors to fulfill the mandate of the design phase including Lockheed Martin Canada as Command and Surveillance Systems Integrator, GE Canada as Integrated Propulsion System Integrator, Lloyd’s Register Group as Classification Society, Odense Maritime Technology (OMT) as Marine Engineering and Naval Architecture Provider, and Fleetway Inc. as Integrated Logistics Support Provider.  Together these companies employ almost 8,000 people across Canada, and an estimated 75 professionals from these suppliers will be dedicated to the AOPS project.

The signing of the AOPS Definition Contract allows contracts to be finalized with these individual organizations and work to begin on the competition and selection of the subsequent subcontractors and businesses required to fulfill the mandate of the AOPS design phase.
 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ecuador Coastguard Orders Damen Patrol Boats

Damen announced it has recently signed a contract with AstillerosNavalesEcuatorianos (Astinave) to construct two Damen Stan Patrols (Spa) 5009 for the Ecuadorian Coastguard.

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

MN 100: Brunswick Commercial and Government Products

420 Megan Z. Ave Edgewater, FL 32132 Telephone: 386 423 2934 E-mail: kelsey.nemeth@whaler.com Website: www.brunswickcgp.com CEO/President: Huw Bower Number

Navy

MN 100: Brunswick Commercial and Government Products

420 Megan Z. Ave Edgewater, FL 32132 Telephone: 386 423 2934 E-mail: kelsey.nemeth@whaler.com Website: www.brunswickcgp.com CEO/President: Huw Bower Number

MN 100: BAE Systems Ship Repair

750 W. Berkley Avenue Norfolk, VA 23523 Tel: (757) 494-4674  Email: john.measell@baesystems.com Website: www.baesystems.com/shiprepair President: William Clifford The Company: BAE Systems,

Signet Tows Aircraft Carrier on Final Voyage

The final voyage of aircraft carrier USS Saratoga begins today. From the Eastern Hemisphere to the Western Hemisphere, the USS Saratoga has made her mark around the globe,

Arctic Operations

Russia Sanctions Could Slow Norwegian Arctic Exploration

Western sanctions against Russia may slow down exploration for oil and gas on both the Norwegian and Russian side of the Arctic Barents Sea, lobby group Norwegian Oil & Gas told Reuters on Wednesday.

Russia Conducts High North Geophysical Surveys

For the first time, as part of the Arctic-2014 high-latitude expedition, nuclear icebreakers 'Akademik Fedorov' and 'Yamal' have conducted an entire complex of geophysical research at the North Pole,

Statoil: Gudrun Officially Opened

Norwegian prime minister Erna Solberg officially opened the Gudrun platform in the North Sea today, 19 August. This is the first new Statoil-operated platform on

 
 
Maritime Contracts Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1627 sec (6 req/sec)