Great Lakes Shipyards Look to Busy Season

Lake Carriers Association
Monday, January 07, 2013

Maintaining and modernizing the U.S.-flag Great Lakes fleet will occupy shipyards when Sault St. Marie, Michigan, locks close soon.

The various projects scheduled for the next few months will require investments that range from $500,000 to almost $3 million per vessel.

Two vessels have already undergone their scheduled maintenance, but once the locks at Sault St. Marie, Michigan close on January 15 the winter work program will begin in earnest. A number of vessels will have steel renewed in their hulls and cargo holds and several will undergo their out-of-water survey this coming winter.

U.S.-flag lakers will further reduce their emissions by upgrading a number of diesel generators and a tug that pushes a self-unloading barge will be completely repowered with a state-of-the-art diesel engine. Other projects include upgrades to navigation equipment and galleys.

Major shipyards on the Lakes are located in Sturgeon Bay and Superior, Wisconsin; Erie, Pennsylvania and Toledo, Ohio. Smaller “top-side” repair operations are located in Cleveland, Ohio; Escanaba, Michigan; Buffalo, New York and several other cities in Michigan.

Employment peaks at about 1,200 during the winter and annual wages top $50 million. In addition, it is estimated that $800,000 in economic activity is generated per vessel in the community in which it is wintering.

Source: Lake Carriers’ Association
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Ship Repair & Conversion

Crewman Claims Ferry Captain "Rushed Back To Bridge"

The captain of a South Korean ferry that capsized two days ago rushed back to the bridge after it started listing severely and tried in vain to right the vessel,

TEPNG Integrates AVEVA Engineering & Design

AVEVA announced that TOTAL E&P Nigeria Ltd. (TEPNG) has adopted AVEVA’s Engineering & Design solutions as part of an Integrated Engineering & Design approach. TEPNG

ClassNK Approves Fillet Welding Consumable

Classification society ClassNK announced that it has granted type approval for the new MX-200F welding consumable, developed by Kobe Steel Co., Ltd. (KOBELCO) to

Workboats

Offshore: Seacor Raises the Bar Again

Long acknowledged as a firm to watch in U.S. crewboat and fast supply boat innovation, Seacor Marine will be attracting industry attention once again when its latest

Miami Tugboat Oil Spill: Coast Guard Respond

The US Coast Guard says that its crewmembers are responding to a fuel spill in the vicinity of Government Cut in Miami, following a leak discovered aboard the 95-foot tugboat 'Neptune'.

Shipbuilding: Vigor Industrial Grows Stronger

Vigor Industrial has ballooned from a modest shipyard in Portland, Oregon, to the largest shipbuilder in the Pacific Northwest and Alaska. Vigor increasingly thinks big and builds big.

Vessels

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Rotterdam port's throughput almost stable

The Port of Rotterdam’s throughput in the first quarter of 2014, at 109 million tonnes, was 0.2% below the level for the corresponding period last year.Split up by goods type,

Divers struggle in search for ferry survivors

Rescuers struggled with strong waves and murky waters on Thursday as they searched for hundreds of people, most of them teenagers from the same school, still missing

Great Lakes

Ice Hurts March’s Lakes Ore Shipments

Massive, thick ice formations on the Great Lakes limited iron ore shipments in March to 1.1 million tons, a decrease of 43 percent compared to a year ago, the Lake

Coast Guard Battles 24-inch Plate Ice

Coast Guard Cutters Morro Bay and Katmai Bay, homeported in Cleveland and Sault Ste. Marie, Mich., conducted ice breaking operations in Marquette, Mich., Sunday.

Great Lakes Shipyard Completes Winter Work

Great Lakes Shipyard announced winter layup season is wrapping up at the yard after completing repair work on the following vessels: American Steamship Company’s

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1144 sec (9 req/sec)