Halyard to Install Exhaust Silencers for Alicat Wind Farm Vessels

MarineLink.com
Monday, May 13, 2013

As the 2013 Seawork International Show approaches, U.K.-based marine exhaust specialist, Halyard, announced thatit has been selected by Great Yarmouth based boat builder Alicat Workboats to ensure its new four WFSV (Wind Farm Support Vessels) remain quiet on the water and to provide increased comfort for those on board.

Alicat Workboats commissioned Halyard to design, build and install a full exhaust silencer system for all four of its new state-of-the-art Offshore Wind Farm Service Vessels.

Alicat Workboats is constructing the four vessels (1x12m, 2x19m and 1x19m) for U.K. energy supplier E.ON with the first due to serve E.ON’s Robin Rigg Wind Farm off the Solway Firth near Cumbria, at the latter part of this year. Throughout the project, Halyard has been working closely with Alicat Workboats to design a bespoke exhaust system in order to drastically reduce all sound and internal reverberation from engine to transom - known to cause sea sickness and discomfort for those working long hours onboard.

The workboats, which will achieve speeds of up to 30 knots will have a Halyard exhaust system fitted to each of its MAN V12 engines, using stainless steel risers and Dual Chamber composite silencers, to effectively eject cooling water and exhaust gases, whilst silencing the engine’s combustion noise.


 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Daihatsu Joins ClassNK Research Project

Classification society ClassNK announced that it will embark on a joint research project together with Daihatsu Diesel Mfg. Co., Ltd. Through the partnership, ClassNK

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

New Double-ended Ferry for Norderney

New double-ended ferry serving the North Sea island of Norderney – Safe and eco-friendly maneuvering in shallow, high-sediment water using Voith Schneider Propellers Ferries

Offshore Energy

CWind Launches New Vessel

CWind, a provider of integrated services to the offshore wind industry, has launched its new vessel CWind Fulmar in a naming ceremony in Brightlingsea. The CWind Fulmar, built by CTruk Ltd.

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1657 sec (6 req/sec)