Marine Link
Monday, September 26, 2016

SMIT Provides Heavy Lift Support

September 12, 2002

SMIT's Taklift 7 called at Thyssen NordSee Werke (TNSW) in Emden, Germany, to perform a series of lifts. The 1,200 tonnes lift capacity sheerlegs was booked to install a 600 tonnes deckhouse and a funnel for a container vessel newbuilding. Taklift 7 arrived in Emden following a mobilisation voyage from Rotterdam. The deckhouse was fabricated at TNSW and delivered to the quay, close to the newbuilding's hull. Taklift 7, using a flyjib and spreader arrangement, then lifted and installed the elements. On completion of the lifts, over a two-day period, Taklift 7 headed for Rotterdam to install a crane on behalf of Nelcon Cranes.The Emden visit formed part of a rolling contract, requiring SMIT to call at the yard at quarterly intervals to assist in the outfitting of newbuildings.

SMIT Transport and Heavy Lift Sales Manager Rik Zwinkels says: "Floating sheerlegs offer high lift capacity and manoeuvrability and, as they work from the water, they cause little or no disruption to normal yard activities, compared to land-based cranes."



Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News