Aker Solutions Awarded Moho Contract

Press Release
Monday, March 25, 2013
Photo: Aker Solutions

Aker Solutions received a Letter of Award from Total for the delivery of a subsea production system for the Moho Nord project in the Republic of the Congo. The contract value is approximately $850 million (U.S.). 
 
The Moho Nord project, located approximately 75 km off the coast of the Republic of the Congo, consists of the two developments Moho Nord and Moho Bilondo 1bis. Aker Solutions and Total will run both developments as one integrated project. 
 
Scope of work within the contract includes the delivery of 28 vertical subsea trees including wellhead systems, two installation and workover control systems, seven manifold structures, subsea control and tie-in systems. The contract also contains options related to Moho Nord which Total may exercise.

The project will utilize Aker Solutions' new vertical tree technology. The workover technology has been developed as part of the Skandi Aker/Tulip project for Total.
 
Management, engineering and procurement will primarily be performed at Aker Solutions' headquarters in Fornebu, Norway. The subsea trees and the workover systems will be manufactured at the Tranby manufacturing center, outside Oslo. The production of the manifolds will be carried out at Aker Solutions' facility in Egersund on the west coast of Norway, while the facility in Aberdeen in the U.K. will deliver the control systems and the wellheads.
 
Moho Nord and Moho Bilondo 1bis are part of the Moho-Bilondo oil field which was commissioned in April 2008 for commercial production. It is the first deepwater offshore field of the Republic of the Congo at water depths ranging between 600 to 1,050 meters.
 
Aker Solutions will also establish a service base together with Total in Pointe Noire which is the second largest city in the Republic of the Congo. Aker Solutions and Total expect that 40 people will be employed at the base. 
 
The first deliveries of the Moho subsea production system will be made in the second quarter of 2014.

www.akersolutions.com

 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Maritime NZ Oil Spill Response Review: Submissions

Maritime New Zealand (MNZ) says it invites submissions on its draft updated New Zealand Marine Oil Spill Response Strategy 2014 (the draft Strategy). The draft Strategy, (available at http://bit.

SHIPPINGInsight 2014 Agenda Announced

Annual Conference, Exhibition and Networking Event Brings Together Shipowners and Technology Companies to Address Practical Solutions for Efficient Operations The

VIDEO: HMS Queen Elizabeth Floats Out

A timelapse video of HMS Queen Elizabeth floating out of her dock for the first time is now available at http://www.youtube.com/watch?v=P0ZjQz9vEKw. The float out of the 65,

Contracts

Abu Dhabi Ports Shift Far More Breakbulk Cargo

Abu Dhabi Ports Company (ABPC) says that general cargo moving through Abu Dhabi’s commercial Ports has increased by 37% this year. ADPC’s commercial ports (Musaffah,

GDI Awards N-KOM US$110-M Contracts

Gulf Drilling International (GDI) Limited, a subsidiary of Gulf International Services (GIS), the largest oilfield service company in Qatar, has awarded two contracts

Bechtel Plant Awarded Nuclear Propulsion Contract Modification

U.S. Department of Defense informs it has awarded a $39,437,949 cost-plus-fixed-fee modification to a previously awarded contract (N00024-12-C-2106) for naval nuclear propulsion components.

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1117 sec (9 req/sec)