US Naval Submarine Modules Shipped by Barge

Press Release
Friday, September 21, 2012
Submarine Modules on Tow: Photo credit HII

Huntington Ingalls Industries' Newport News Shipbuilding (NNS) division ship two Virginia-class submarine modules to program partner General Dynamics Electric Boat (GDEB)

This was the first for the program and part of the plan to increase shipment capacity in support of the U.S. Navy's two-submarines-per-year build rate.

The module that comprises the torpedo room for North Dakota (SSN 784) was loaded onto the sea shuttle, which is used for the two-plus-day voyage to Electric Boat's main shipyard in Groton, Conn. Right behind it was the module containing the auxiliary machine room (AMR) for John Warner (SSN 785), which is headed to Electric Boat's fabrication plant in Quonset Point, R.I. The AMR, which departed on a commercial barge, comprises machinery such as a back-up diesel generator, pumps, motors and other electrical equipment.

This use of the commercial barge also represented the first time two major modules were being moved simultaneously between Virginia and southern New England.

"These shipments represent the 99th and 100th barge shipments between Electric Boat and Newport News Shipbuilding," said Jim Hughes, NNS' vice president, Submarines and Fleet Support. "It's satisfying to see these units being exchanged at such a remarkable pace, and we look forward to turning the final products over to the U.S. Navy."

In addition to these 100 shipments, General Dynamics Electric Boat has made about 900 shipments between its Groton and Quonset Point facilities using its sea shuttle barge, said Kurt A. Hesch, Electric Boat's vice president for the Virginia program.

"Barge shipments help make modular construction possible," Hesch said. "Without this, heavy lift capability shipments would have to be much smaller, much more assembly would have to be done at the delivery yard, and there would be a corresponding loss of efficiency."



 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

FIO’s New Research Vessel Enters Build Phase

The 78’ research vessel designed and engineered by Boksa Marine Design (BMD) in 2015 is headed to the building phase beginning in June.   BMD contracted with

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Maritime Future Summit: Digital Shipping

Autonomous ships, smart on-board systems: At the Maritime Future Summit on September 5, industry leaders will discuss the future of shipping. For the first time

Navy

This Day In Naval History - May 24

1917 - The first U.S. convoy left Hampton Roads, Va. to cross the North Atlantic after entering World War I. During the 18 months of war while American vessels escort convoys through the war zone,

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Ingalls Christens Amphibious Transport Dock Portland

Ingalls Shipbuilding, a division of Huntington Ingalls Industries (HII), christened the amphibious transport dock Portland (LPD 27) on May 21 in front of approximately 1,000 guests.

 
 
Maritime Contracts Maritime Standards Navigation Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0812 sec (12 req/sec)