Baltic Wind Success Paves Way for Ecosse

Gregory R. Trauthwein, Editor and Associate Publisher
Thursday, November 07, 2013
Ecosse Subsea Systems managing director, Mike Wilson, with the SCAR subsea plough

Ecosse Subsea Systems (ESS) has completed a $7.5m boulder clearing and pre-lay trenching project which it claims has been one of the most successful ever conducted for the wind energy sector. As subcontractor to Siem Offshore Contractors (SOC), the Banchory-based subsea specialist completed 86 boulder clearing passes followed by 172 first and multi-passes over a 90km route during a 13-week boulder clearing and trenching campaign on the EnBW Baltic 2 offshore wind farm project.

Several thousand boulders ranging up to 4m in size were cleared from the individual cable routes and ESS performed 260 individual route passes in varying and sometimes challenging soil conditions. EnBW Baltic 2 is an 80 turbine development located 32km north of Rügen island in the German exclusive economic zone of the Baltic Sea and owned by the German utility company EnBW. The 27 sq. km site spans water depths ranging from 20m to 45m LAT and has a wide array of soil conditions from fine sands to glacial tilt with areas of gravels and cobbles with numerous boulders.

ecosse-subsea.com


(As published in the October 2013 edition of Marine Technology Reporter - www.seadiscovery.com)

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Aberdeen Pupils Peek into Subsea Oil & Gas Technology

Pupils at an Aberdeen primary school were given a rare insight into the depths of the oil and gas industry’s subsea sector after getting to sit in the driving

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

FORAN for Pertamina's Future Ships

FORAN has been chosen by state-owned company PERTAMINA to review the design of their future oil product carrier ships, under construction in a shipyard with the FORAN System.

Wind Power

Monopiles Terminal to Be Built in Rotterdam

Sif and Verbrugge to build terminal for offshore wind energy on Maasvlakte 2   Sif Group, Verbrugge International and the Port of Rotterdam Authority have signed

Boskalis Wins Veja Mate OWF Foundations Deal

Royal Boskalis Westminster N.V. (Boskalis) in partnership with VolkerWessels (Volker Stevin International) has been awarded a contract by Veja Mate Offshore Project GmbH for the design,

Wave Power Unit for Victorian Waters

BioPower Systems Pty Ltd (BioPower) has finished constructing its prototype wave power unit to be installed off the coast of Port Fairy, Victoria, later this year.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1751 sec (6 req/sec)