Huisman Successfully Delivers 600mt Pedestal Crane

Press Release
Tuesday, May 10, 2011

On Tuesday 8 March 2011, Huisman, the Dutch-based specialist in lifting, drilling and subsea solutions, successfully completed the load testing of the new build 600mt Pedestal Crane onboard Wind Turbine Installation Vessel “MPI Resolution”. The load test was the final step before the crane was handed over to the clients Centrica Renewable Energy Ltd and MPI Offshore Limited.

The crane was constructed, installed, commissioned and tested at the Huisman facility in Schiedam, The Netherlands with the final load test taking place at the Keppel Verolme yard in Rozenburg, The Netherlands. The fact that the handover took place within 15 months after signing of the first agreement was a major achievement of all parties involved.

The 600mt Pedestal Crane is custom-designed for the installation of offshore wind turbines and derives from Huisman’s many years of experience in the design, fabrication and service of heavy lifting equipment. The state-of-the-art crane combines unique technical features, such as a full electric variable frequency drive system, a low overall construction weight and a small minimum operating radius. Furthermore all the major equipment, such as hoist winches, is installed inside the enclosed crane house. This offers a good protection for the harsh marine environment.

With the new crane the MPI Resolution is prepared to handle larger wind turbine components for long term vessel charterer Centrica. The upgraded vessel is scheduled to be deployed for turbine installation operations upon the 270MW Lincs wind farm project.

Huisman has scheduled to deliver a second 600mt Pedestal Crane for another client in the fourth quarter of this year.

Source: www.huismanequipment.com


Offshore

Onshore Spending on the Cusp of Recovery?

DW’s recently released quarterly World Oilfield Services Market Forecast (OFS) and World Oilfield Equipment Market Forecast (OFE) continue to suggest 2016 will

US Offshore Lease Sale Yields $18 Mln in High Bids

Today’s U.S. oil and gas Lease Sale 248 garnered $18,067,020 in high bids for 24 tracts covering 138,240 acres in the Western Gulf of Mexico Planning Area, announced

Canada May Ask Far-offshore Drillers to Pay Extra

Canada may ask oil companies to contribute to the hundreds of millions of dollars or more the country has to pay to an international body if they drill far offshore,

Marine Equipment

MV WERFTEN, Foreship Sign Design Agreements

MV WERFTEN signed a letter of intent with the engineering company Foreship in Stralsund today. The agreement includes parts of the basic design as well as design,

Zumaia Offshore Acqires MPP Workboat Aitana B

In April 2016 Zumaia Offshore, S.L., leading workboat owner and operator based in the Basque Country, took delivery of the Cummins-powered MPP workboat “Aitana

Maersk Line's Innovative Smart Reefers

Have you heard about Maersk Line's smart reefers that can listen and talk? Cutting edge technology that reduces risk in customer supply chain, claims Maersk Line.

 
 
Maritime Standards Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0787 sec (13 req/sec)