Offshore Platform 'Olympus' Hull Texas-bound

Press Release
Wednesday, November 28, 2012
'Olympus' TLP Underway: Photo credit Shell Offshore

Shell Offshore's main body of the 'Olympus' Tension Leg Platform (TLP) leaves South Korea aboard Dockwise ship.

The approximately 32,500 metric ton main body of the Olympus TLP begins its two month journey to the U.S. Gulf Coast on Dockwise's Blue Marlin semi-submersible heavy lift ship.

The hull is expected to reach Ingleside, Texas in early 2013 where installation of the topsides will take place before the TLP departs for its final location on the Mars Field in the Gulf of Mexico.

The Mars Field, owned by Shell (71.5%) and BP (28.5%), and operated by Shell, continues to contribute to the Gulf of Mexico's position as a critical component of the US energy supply. Discovered in 1989 and brought onto production in 1996, the Mars Field is considered one of the largest resource basins in the Gulf of Mexico. The site for the Olympus TLP, known as the Mars B development, is located about 130-miles south of New Orleans in the Mississippi Canyon and lies in approximately 3000 feet of water.

The Olympus TLP, Shell's sixth and largest tension leg platform, will also provide process infrastructure for two of Shell's deep water discoveries, West Boreas and South Deimos. The Mars B development is the first project of its kind to expand an existing deep water Gulf of Mexico oil field. A combination of factors produced this growth, including improved understanding of the reservoir and recovery potential due to advanced seismic and modeling technologies, and new discoveries in the Mars Field.

 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

25,000-TEU Ships Possible, Not Practical

Maersk Line CEO Soren Skou said ships with capacities of 25,000 twenty-foot-equivalent units are possible but not practical today, and that he expects 18,000-19,

Floater Orders 2014

25 Units Orders in 2014:  10 FPSOs, 1 Barge, 4 FLNGs, 7 FSRUs & 3 FSOs The overall number of orders is similar to the average ordering pace over the past 10 years,

Editorial: Gettin’ Crabby with Deadliest Catch

As February is our traditional cruise shipping edition, naturally we’ve selected a fishing boat and two crabs for the cover. But as many of you may already know,

Offshore

Nabors Posts Quarterly Loss as Drilling Activity Slows

Offshore driller Nabors Industries Ltd reported a quarterly loss, hurt by lower drilling activity amid a slump in global crude prices.   The company posted a net loss of $891.

Maersk Drilling Secures Contract for Newest Drillship

Maersk Drilling was awarded a contract from eni Ghana Exploration and Production Ltd. for employment of the newbuild drillship Maersk Voyager.   The contract

Floater Orders 2014

25 Units Orders in 2014:  10 FPSOs, 1 Barge, 4 FLNGs, 7 FSRUs & 3 FSOs The overall number of orders is similar to the average ordering pace over the past 10 years,

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1837 sec (5 req/sec)