Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Manufacturing Facilities News

06 Feb 2024

Austal USA Plans New Facility and Shiplift in Mobile

(Image: Austal USA)

Shipbuilder Austal USA announced it is planning to boost capacity at its Mobile, Ala. shipyard with the addition of a new manufacturing facility.The infrastructure expansion, which will be to the south of Austal USA’s current waterfront facility, will include a new assembly building, waterfront improvements, and a new Pearlson-designed shiplift system. Start of construction on the project is planned for summer 2024.The construction of this new building and waterfront support area continues the expansion Austal USA began in March 2021 with the groundbreaking of the steel panel line.

24 Oct 2023

New York Throws Support Behind Offshore Wind with Three Project Awards

© Global Image Archive / Adobe Stock

New York officials on Tuesday said the state has awarded conditional contracts to three offshore wind projects as part of a massive renewable energy procurement that will provide 12% of the state's power needs in 2030.The announcement, which the state billed as the nation's largest ever investment in offshore wind, comes less than two weeks after New York regulators rejected requests by three offshore wind developers to renegotiate their contracts because of soaring costs. In response…

28 Aug 2023

Offshore Wind: US Shipbuilders Answering the Call

From left to right: Lasse Petterson, CEO of Great Lakes Dredge and Dock; Rep. Mary Gay Scanlon, D-Pa.; President Joe Biden; and Steinar Nerbovik, CEO of Philadelphia Shipyard (Photo: Philly Shipyard)

It’s a big deal when a U.S. president visits an American shipyard, and these trips always send a message. When President Obama spoke at HII’s Newport News Shipbuilding in 2013, he warned of the consequences of sequestration. President Trump’s 2020 speech at Fincantieri Marinette Marine touted a $5.5 billion naval contract that gave a welcome boost to the Wisconsin shipyard and its supply chain partners. Most recently, President Biden traveled to Philadelphia’s Philly Shipyard…

20 Jul 2023

Biden Attends Steel Cutting for Great Lakes' Subsea Rock Installation Vessel

From left to right: Lasse Petterson, CEO of Great Lakes Dredge and Dock; Rep. Mary Gay Scanlon, D-Pa.; President Joe Biden; and Steinar Nerbovik, CEO of Philadelphia Shipyard (Photo: Philly Shipyard)

President Joe Biden traveled to Philadelphia on Thursday to attend a steel cutting ceremony for Great Lakes Dredge & Dock Corporation's new offshore wind rock placement vessel, touting his administration’s clean energy agenda and job creation efforts as the U.S. builds up its offshore wind industry. "The clean energy future we’re building all across America will be transformational,” Biden said during the ceremony at Philly Shipyard. “Thousands of families will rely on good jobs these projects create…

22 Jun 2023

USCG Commandant Visits Austal USA

(Photo: Austal USA)

Admiral Linda Fagan, U.S. Coast Guard Commandant, visited Austal USA Thursday to tour the Mobile, Ala. shipyard's manufacturing facilities and discuss the company’s contract for the service’s Heritage-class Offshore Patrol Cutter (OPC).Austal USA said in a press release its leadership briefed the Commandant on the company’s steel shipbuilding production line. The 117,000 square foot steel panel line, where OPC construction will begin in mid-2024, houses state-of-the-art computerized and robotic steel processing equipment to handle the current and future demands of the U.S. Coast Guard and U.S.

09 May 2023

Young Named VP Production Ops at Austal USA

Austal USA promoted Chris Young to Vice President of Production Operations. Young, formerly Senior Director of Production, is a 26-year veteran of Austal with 19 of those years spent at Austal USA’s new construction manufacturing facilities in Mobile. Photo courtesy Austal USA

Austal USA promoted Chris Young to Vice President of Production Operations. Young, formerly Senior Director of Production, is a 26-year veteran of Austal with 19 of those years spent at Austal USA’s new construction manufacturing facilities in Mobile. Young’s tenure with Austal began immediately following school in Perth, Australia, when he joined the company as a structural engineering apprentice. Young was soon asked to travel to the US to join the Austal USA team as it stood up operations in Mobile, Ala.

13 Feb 2023

New York Offshore Wind Facility Could Create 420 Direct Jobs

©Siemens Gamesa

Wind turbine maker Siemens Gamesa said Monday it planned to build a major offshore nacelle manufacturing facility in New York state. The construction of the plant depends on Siemens Gamesa's wind turbines being selected by the New York authorities in their third offshore wind solicitation. The planned facility would be located at the Port of Coeymans. According to Siemens Gamesa, the facility would create up to about 420 direct jobs, support a significant rise in indirect jobs and represent an investment of around $500 million in the region.

07 Feb 2023

US Great Lakes Fleet Set for $126 Million in Winter Work

(Photo: Lake Carriers’ Association)

The U.S. Great Lakes shipping fleet has begun the annual transition from sailing to scheduled periods in regional docks and ship repair facilities for repair, maintenance and modernization.This year alone, U.S. Great Lakes shipping companies will invest more than $126 million in their vessels—from over 1,000-feet to smaller tug and barge combinations—at shipyards and facilities across the Great Lakes, according to trade group the Lake Carriers’ Association. This includes more than $48 million in Wisconsin…

06 Feb 2023

EVENT: Reuters U.S. Offshore Wind Returns to Boston

Copyright Cavan/AdobeStock

Reuters Events has officially launched their flagship offshore wind event, US Offshore Wind 2023 (USOW23) being held in the Hynes Convention Center, Boston, July 11-12, 2023.The event will unite more than 1000 offshore wind developers, utilities, OEMs, financiers, and supply chain executives, hosting industry-breaking discussions covering all corners of project development, from permitting through to construction.Click here to see the Speaker and Agenda line-upU.S. Offshore Wind ConfEx 2023 will feature more than 70 speakers across two tracks…

03 Feb 2023

GE Wants to Build Offshore Wind Blade, Nacelle Manufacturing Sites in New York

GE's Haliade-X offshore wind turbine - Image Credit: Danny Cornelissen for GE Renewable Energy (file photo)

General Electric recently filed a plan to build two new offshore wind manufacturing facilities in New York if it wins enough orders from companies in the state’s ongoing solicitation for up to 4.6 GW of offshore wind.GE proposed building the factories with Carver Companies at their Port of Coeymans site. The company said that, should it receive sufficient order volume, its LM Wind Power subsidiary would be ready to build a "state-of-the-art facility" for the construction of offshore wind turbine blades.

07 Nov 2022

Great Lakes Winter Supply Chain – A Cause for Concern

(Image: Lake Carriers’ Association)

As the temperatures start their annual decline on the Great Lakes, an icy chill is in the air. Shipping companies across the lakes are rushing to get final loads of critical raw materials from the northern lakes to the manufacturing facilities on the lower lakes. The gales of November began blowing in October this year, tightening the constraint on the remaining days before the large navigational lock in Sault Ste. Marie, Mich. will close for the season and shipping virtually halts.While high winds and seas can only be avoided, ice can be effectively managed by the U.S.

03 Nov 2022

Cable Installation Kicks Off at U.S. First Commercial Scale Offshore Wind Farm

©Vineyard Wind

Cable installation has kicked off at Vineyard Wind, the U.S. first commercial scale offshore wind farm, at a site located 15 miles south of Martha’s Vineyard. Vineyard Wind, the company developing the namesake wind farm, also announced that it expects to begin nearshore cable work off the south coast of Cape Cod in the coming days. The work is being conducted by Prysmian Group, the subsea cable manufacturing and installation firm based in Italy.Prysmian recently announced plans to build the first U.S.-based offshore wind subsea cable factory in Somerset…

12 Apr 2022

Geotechnical, Marine, and Coastal Design Solutions for Marshaling Ports to meet US Offshore Wind Power Policy Targets

Before!: Images Courtesy of Connecticut Port Authority. Rendering Artist: Jennifer Gottlieb, AIA NCARB ENV SP at AECOM

As reported in a Maritime Reporter and Engineering News February 2022 article, Offshore Wind Development Gains Speed in the United States, the offshore wind (OSW) market is beginning to heat up. The White House policy target of 30 GW of offshore wind power by 2030, increasing the Bureau of Ocean Energy Management’s (BOEM’s) leasing awards, and permitting target approval dates, together with more state energy procurement awards, are creating demand for more port infrastructure, Jones Act compliant vessels, and manufacturing facilities for wind farm components.

21 Mar 2022

Carboline: 'Bigger and Better' at 75 Years

(Photo: Carboline)

St. Louis-based coatings specialist Carboline is celebrating its 75th year in business in 2022. From humble beginnings in 1947, Carboline has grown into a global organization that has launched more than 500 products, with more than seven research facilities, 20 manufacturing facilities and hundreds of warehouses. Still, the company has remained laser-focused on quality, innovation and top-notch service.“Our offering to the maritime market is very unique,” said Brad Treuting, Carboline’s director of sales for marine and offshore in the U.S. Gulf and East Coast.

01 Feb 2022

Carboline Celebrates 75 Years

(Photo: Carboline)

This year marks the 75th anniversary of Carboline, a global leader in coatings, linings and fireproofing. Carboline was founded by Stanley Lopata in St. Louis, Missouri, in 1947 and has grown into a global organization.Company president, Chris Tiernay remarked, "Two thousand twenty-two marks our 75th anniversary, an accomplishment we are tremendously proud of. For 75 years, Carboline has been solving some of the industry's most challenging problems. We remain committed to the idea that there is always a solution.

15 Sep 2021

House Transportation Committee Funds Key Great Lakes Projects

The Coast Guard Cutter Mackinaw, a 240-foot heavy icebreaker, breaks ice near Marine City, Mich., along the St. Clair River (Photo: Daniel R. Michelson / U.S. Coast Guard)

The House Transportation and Infrastructure Committee on Tuesday approved $1 billion for U.S. Coast Guard shore side infrastructure nationwide and $350 million for a heavy Great Lakes icebreaker as part of its budget reconciliation bill, an action that the Great Lake Maritime Task Force (GLMTF) called “great news for the Great Lakes.”The GLMTF described the heavy Great Lakes icebreaker as desperately needed and expects that a portion of the infrastructure funds will go to good…

09 Aug 2021

Siemens Gamesa, GRI Renewables Invest in NE England Offshore Wind Production

© masterskuz55/AdobeStock

Siemens Gamesa and GRI Renewables Industries will invest more than $360 million into offshore wind manufacturing facilities in northeast England.Siemens Gamesa will invest a total of $258m to expand its blade manufacturing site located near Hull - Britain's largest offshore wind manufacturing facility - readying it for the next generation of offshore wind turbines and blades greater than 100 metres, the government said.Siemens Gamesa will add 200 workers to the 1,000 it already employs in the factory…

23 Jun 2021

Austal Nets Deal with U.S. Navy for Light Amphibious Warship Design

Illustration only - Credit: Kalyakan/AdobeStock

Shipbuilder Austal USA has won concept studies and a preliminary design contract by the United States Navy for the Light Amphibious Warship (LAW) program.The USN’s new Light Amphibious Warship (LAW) program envisions procuring a class of 28 to 30 new amphibious ships to support the Marine Corps, particularly in implementing a new Marine Corps operational concept called Expeditionary Advanced Base Operations (EABO). The Navy envisions the first LAW being procured in FY2023.LAW…

09 Jun 2021

De Nora Acquires Hyde Marine

Hyde GUARDIAN (Image: Hyde Marine)

De Nora said it has acquired Calgon Carbon Corporation's UV Technologies Division (CCUV), including the products, brands and assets of UV ballast water management systems (BWMS) manufacturer Hyde Marine as well as municipal and industrial water treatment brands RAYOX, SENTINEL and C3 SERIES UV.The acquisition was signed on June 7 and is expected to close on July 1, De Nora said.By combining De Nora BALPURE electrolytic disinfection (EC) BWMS and the Hyde Marine ultra-violet (UV) Hyde GUARDIAN BWMS, De Nora will offer both UV and EC BWMS over a full range of flows.

17 Feb 2021

Seaspan Ferries to Trial Corvus' New Blue Whale ESS

(Photo: Seaspan Ferries Corporation)

Canadian operator Seaspan Ferries Corporation said it will be the first to trial Corvus Energy’s new Blue Whale ESS, featuring a unique rack-free design of stacking modular blocks to provide higher volumetric battery room energy density and, consequently, maximized passenger or payload capacity.The new large-scale energy storage system (ESS)—a battery system designed for large ships with high zero-emission energy demand, such as cruise ships, large Ro-Pax and Ro-Ro ferries and cargo ships—will be installed on board Seaspan Reliant…

16 Jun 2020

Offshore Wind Will Bring Jobs, Growth to New Jersey, Other Coastal States

NOIA President Erik Milito issued the following statement after New Jersey Governor Phil Murphy announced the creation of the nation's first purpose-built marshalling and manufacturing port dedicated to the offshore wind industry:"New Jersey is making a smart move by betting on offshore wind. A thriving and innovative American offshore wind sector is close, but we need to invest in improved ports and infrastructure to make it a reality. Expanded port and manufacturing facilities up and down the East Coast will bolster the construction bandwidth for offshore wind, creating efficiencies and reducing the risk of prohibitive delays. With a $70 billion supply chain and an estimated 83…

12 Jun 2020

The Emerging U.S. Offshore Wind Industry in a Post-COVID-19 World

Join a webinar on June 17, 2020 for the global release of a major new market study on the depth, breadth and growth prospects of the Offshore Wind Market -- https://zoom.us/webinar/register/WN_UR5uY1boTOKdAAcAXDbR4g
© zozulinskyi/AdobeStock

Join a webinar on June 17, 2020 for the global release of a major new market study on the depth, breadth and growth prospects of the Offshore Wind Market --  https://zoom.us/webinar/register/WN_UR5uY1boTOKdAAcAXDbR4gJust when it was looking like the offshore wind industry was finally about to take off in the United States, the COVID-19 pandemic has introduced one more significant layer of uncertainty upon an already very complicated playing field. There are currently 15 active offshore wind projects in the planning stages which…

28 Apr 2020

Van Oord Installs Slip Joint Foundation at Borssele Wind Farm Site

Image Credit: Van Oord

Dutch offshore installation and construction company has installed what it calls the "Slip Joint" foundation at the Borssele Wind Farm Site V in the Dutch sector of the North Sea.The Slip Joint is an alternative connection between foundation elements, a monopile, and a transition piece. It consists of two conical sections placed on top of each other. The foundation was installed at at the Borssele Wind Farm Site V on April 25."It is the first time anywhere that a submerged Slip Joint was used on a full-sized offshore wind turbine on a fully commercial basis…