The Ultimate Rough Weather WFSV

press release
Monday, January 16, 2012
the Ad Hoc 24m FastSwath design.

Ad Hoc Marine Designs Ltd has has released details of its Ultimate WFSV, a fast SWATH.
 
 

In the offshore windfarm support scenario it is becoming increasingly clear that the seakeeping ability of the current medley of workboats is not up to the job when the going gets rough. This is exacerbated by current and future windfarms that are being positioned further out to sea in more onerous seastates. There is the need to get out there in short time (i.e. fast) in rough water especially in harsh winter conditions and to be steady enough against the tower to be able to get the technicians safely across. Downtime becomes a real issue for the operators.
 
 

Whatever claims are made by the builders/operators for the seakeeping of the current range of catamarans for wind farm servicing there is little doubt that these small craft 15m to 25 m long have limitations when it comes to meeting head seas in particular. Speeds of 25 knots are mentioned. Significant wave heights of 2m are also mentioned. But the reality is that the two numbers don’t go together. A considerable reduction of speed is enforced by the violent motion in even 1m seas. This is a problem that has plagued the researchers and designers of small fast craft for over a century- that of combining speed and seakeeping.
 
 

So, imagine doing 25 knots in 2m significant wave height head seas in such a small boat at full power, in comfort and in safety!   Impossible in reality in the existing size range 15m - 25m windfarm vessels.   Yet the Ad Hoc 24m FastSwath design can do all this with superior comfort levels for the technicians and crew onboard.  The loss of speed as wave height increases is very low compared to a catamaran as are the motions (accelerations).  This FastSwath design will also be remarkably dry.   Ride control is passive in the standard design but active ride control is an option.
 
 

Against the wind tower the FastSwath will push in the conventional way.  The difference is that the up and down force on the fender resulting from the passing waves is one quarter of the force that a catamaran imposes.   Consequently you don’t need to push nearly so heavily to maintain contact and make the bow fender stick. Why is this design so much faster than other SWATHs?  It’s a combination of the high length to displacement ratio hull form and an extraordinarily high propulsive coefficient.  The propellers are large and the wake flow into them very energy efficient.
 
 

With speeds that are comparable to existing 25m catamarans yet with remarkable seakeeping, it is the ultimate rough weather WFSV. The design is based upon 20 years of experienced gained from previous SWATH designs already plying the waters around the world, including the worlds fastest SWATH MV Sunflower II (Previously MV Patria) at 31knots, 2 SWATHs for the UK MoD and also the production naval architecture of the Lockheed Martin SLICE. A smaller slower variant is currently in production at a shipyard in Asia.
 

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Oranjewerf Ship Repair becomes Damen Shiprepair Oranjewerf

On 1 July 2015, Oranjewerf Ship Repair, which joined Damen Shipyards Group in 1989, will officially change its name to Damen Shiprepair Oranjewerf. This name

Shell Steps Closer to Arctic Drilling

The U.S. Fish and Wildlife Service authorized the nonlethal, incidental, and unintentional take of small numbers of polar bears and Pacific walrus that result

New Products

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

SevenCs Launches New ECDIS Kernel

The new version of the SevenCs ECDIS Kernel SDK (Software Development Kit) 5.20 has been designed to meet all future requirements of the latest international standards

Samsung Bags Order for Decks on Johan Sverdrup

Statoil, on behalf of the Johan Sverdrup license, has awarded Samsung the contract for decks for both the process and riser platforms.  The total contract value is NOK 7 billion.

Shipbuilding

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Oranjewerf Ship Repair becomes Damen Shiprepair Oranjewerf

On 1 July 2015, Oranjewerf Ship Repair, which joined Damen Shipyards Group in 1989, will officially change its name to Damen Shiprepair Oranjewerf. This name

Samsung Bags $4.7bn Order for 3 FLNG from Shell Gas

South Korean shipbuilder Samsung Heavy Industries Co. as won a 5.2 trillion won (US$4.7 billion) order to build three floating liquefied natural gas (FLNG) facilities, reports Yonhap.

Naval Architecture

Sanamar Launches 3 Tugs from New Yard

Sanmar’s new custom-built, general purpose shipyard at Altinova, Turkey, has launched three 60-metric-ton bollard pull tugs on the same day, less than five months since work first started at the yard.

Evergreen Names Penultimate L-type Containership

A naming ceremony was held for the Evergreen Group’s newest containership, Ever Lovely, the ninth of its L-type vessels to be built by CSBC Corporation in Taiwan

ShipServ opens Singapore office

ShipServ, the leading marine and offshore marketplace with an expected annual trade of $3bn in 2015, has cemented its position in Asia with the opening of a new office in Singapore.

News

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Oranjewerf Ship Repair becomes Damen Shiprepair Oranjewerf

On 1 July 2015, Oranjewerf Ship Repair, which joined Damen Shipyards Group in 1989, will officially change its name to Damen Shiprepair Oranjewerf. This name

Shell Steps Closer to Arctic Drilling

The U.S. Fish and Wildlife Service authorized the nonlethal, incidental, and unintentional take of small numbers of polar bears and Pacific walrus that result

Maritime Safety

China Says Indian Ocean Not Backyard of India

The perception that Indian Ocean is India's "backyard" may result in clashes, Chinese military officials and experts have cautioned.    The Indian Ocean cannot

Motion Compensation Solution for Solan Field

Ampelmann provides access solution for commissioning of the Solan project in West of Shetland   Motion compensated access solutions developer Ampelmann informs

Pirates and Hold-ups: Crime Strikes Venezuela's Oil Industry

When night falls over western Venezuela, armed gangs known as "pirates" sometimes ride boats into muggy Lake Maracaibo to steal equipment from oil wells.   In the country's Paraguana peninsula,

Vessels

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Samsung Bags $4.7bn Order for 3 FLNG from Shell Gas

South Korean shipbuilder Samsung Heavy Industries Co. as won a 5.2 trillion won (US$4.7 billion) order to build three floating liquefied natural gas (FLNG) facilities, reports Yonhap.

Cargoship Disabled and Grounded in Dardanelles

General cargo vessel Ibrahim Konan  (7,618 dwt, built 2008) today (July 1) suffered rudder failure and ran aground in Dardanelles in front of Eceabat in Turkey,

Wind Power

Monopiles Terminal to Be Built in Rotterdam

Sif and Verbrugge to build terminal for offshore wind energy on Maasvlakte 2   Sif Group, Verbrugge International and the Port of Rotterdam Authority have signed

Boskalis Wins Veja Mate OWF Foundations Deal

Royal Boskalis Westminster N.V. (Boskalis) in partnership with VolkerWessels (Volker Stevin International) has been awarded a contract by Veja Mate Offshore Project GmbH for the design,

Wave Power Unit for Victorian Waters

BioPower Systems Pty Ltd (BioPower) has finished constructing its prototype wave power unit to be installed off the coast of Port Fairy, Victoria, later this year.

 
 
Maritime Careers / Shipboard Positions Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3380 sec (3 req/sec)