The Ultimate Rough Weather WFSV

press release
Monday, January 16, 2012
the Ad Hoc 24m FastSwath design.

Ad Hoc Marine Designs Ltd has has released details of its Ultimate WFSV, a fast SWATH.
 
 

In the offshore windfarm support scenario it is becoming increasingly clear that the seakeeping ability of the current medley of workboats is not up to the job when the going gets rough. This is exacerbated by current and future windfarms that are being positioned further out to sea in more onerous seastates. There is the need to get out there in short time (i.e. fast) in rough water especially in harsh winter conditions and to be steady enough against the tower to be able to get the technicians safely across. Downtime becomes a real issue for the operators.
 
 

Whatever claims are made by the builders/operators for the seakeeping of the current range of catamarans for wind farm servicing there is little doubt that these small craft 15m to 25 m long have limitations when it comes to meeting head seas in particular. Speeds of 25 knots are mentioned. Significant wave heights of 2m are also mentioned. But the reality is that the two numbers don’t go together. A considerable reduction of speed is enforced by the violent motion in even 1m seas. This is a problem that has plagued the researchers and designers of small fast craft for over a century- that of combining speed and seakeeping.
 
 

So, imagine doing 25 knots in 2m significant wave height head seas in such a small boat at full power, in comfort and in safety!   Impossible in reality in the existing size range 15m - 25m windfarm vessels.   Yet the Ad Hoc 24m FastSwath design can do all this with superior comfort levels for the technicians and crew onboard.  The loss of speed as wave height increases is very low compared to a catamaran as are the motions (accelerations).  This FastSwath design will also be remarkably dry.   Ride control is passive in the standard design but active ride control is an option.
 
 

Against the wind tower the FastSwath will push in the conventional way.  The difference is that the up and down force on the fender resulting from the passing waves is one quarter of the force that a catamaran imposes.   Consequently you don’t need to push nearly so heavily to maintain contact and make the bow fender stick. Why is this design so much faster than other SWATHs?  It’s a combination of the high length to displacement ratio hull form and an extraordinarily high propulsive coefficient.  The propellers are large and the wake flow into them very energy efficient.
 
 

With speeds that are comparable to existing 25m catamarans yet with remarkable seakeeping, it is the ultimate rough weather WFSV. The design is based upon 20 years of experienced gained from previous SWATH designs already plying the waters around the world, including the worlds fastest SWATH MV Sunflower II (Previously MV Patria) at 31knots, 2 SWATHs for the UK MoD and also the production naval architecture of the Lockheed Martin SLICE. A smaller slower variant is currently in production at a shipyard in Asia.
 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

NSRP Risk Management Panel and SCA Joint Meeting

The National Shipbuilding Research Program (NSRP) Risk Management Panel will be meeting jointly with the Shipbuilders Council of America (SCA) November 5-6, 2014 in Virginia Beach, Va.

WEG to Showcase Drive Solutions at SMM

WEG, a global supplier of drive systems, will showcase its range of systems for the shipbuilding and offshore industry at this year’s SMM (Shipbuilding, Machinery & Marine Technology Fair) in Hamburg.

Kirby Reports Record Q2 2014

Record 2014 second quarter earnings per share of $1.31 compared with $1.11 in the 2013 second quarter, which included a $0.07 benefit due to the reduction of the United earnout liability.

Shipbuilding

NSRP Risk Management Panel and SCA Joint Meeting

The National Shipbuilding Research Program (NSRP) Risk Management Panel will be meeting jointly with the Shipbuilders Council of America (SCA) November 5-6, 2014 in Virginia Beach, Va.

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

Fincantieri to Build Third New Princess Cruises Ship

Fincantieri says it has signed an agreement with Carnival Corp. to build  the new cruise ship for its Princess Cruises brand at a cost of about 600 million euros.

News

NSRP Risk Management Panel and SCA Joint Meeting

The National Shipbuilding Research Program (NSRP) Risk Management Panel will be meeting jointly with the Shipbuilders Council of America (SCA) November 5-6, 2014 in Virginia Beach, Va.

US DOE Approves Oregon LNG Export Project

The U.S. Energy Department said on Thursday it has approved Oregon LNG to export liquefied natural gas, as the Obama administration works through applications to

CFOA Schedules Annual Conference

The 2014 Canadian Ferry Operators Association (CFOA) annual AGM & Conference is scheduled to take place September 29-30 in Quebec City. The two-day conference

Maritime Safety

BMT ARGOSS Awarded OHSAS 18001

BMT ARGOSS, an operating company of BMT Group Ltd. has been awarded the universally recognized standard for occupational health and safety, BS OHSAS 18001. BMT ARGOSS,

Piracy Activity Drifts Towards Southeast Asia

Since 2010, there has been a steadily increasing trend of piracy attacks in Southeast Asia, according to a report released by UNITAR (UN Institute for Training and Research),

Hellfire Missile Firing a First for New Navy Helicopters

The Royal Australian Navy’s newest maritime combat helicopter, the MH-60R Seahawk ‘Romeo’, has successfully fired its first ‘Hellfire’ missile in the United States.

Vessels

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

Pre-Mooring Safety Inspections at Trieste, Italy

The SIOT/TAL Terminal at Trieste has advised that the TAL Pre-Mooring Safety Inspection program will be modified from 1 September. The checks at road will affect:

Hornbeck Offshore Ride High on Q2 2014 Results

Hornbeck Offshore Services, Inc. has announced its financial results for the second quarter ended June 30, 2014.  Following are highlights for this period and excerpts

Wind Power

Refurbished Seajacks Vessels Leave Shipdock Amsterdam

Seajacks Leviathan and Seajacks Kraken are prepared for their coming assignments, following a series of repair and renewal jobs by Shipdock Amsterdam. The shipyard,

Westermeerwind Wind Farm Construction Begins

Mammoet announced today that Westermeerwind BV has reached financial close on July 25 for the turnkey construction of the Westermeerwind wind farm in Ijsselmeer,

6 MW Offshore Wind Turbine of Siemens Certified

Siemens Energy has obtained type certification of DNV GL for the company's innovative D6 offshore wind turbine. The model Siemens SWT-6.0-154 is equipped with a modern direct drive generator,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2513 sec (4 req/sec)