Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Steel Renewal News

11 Jan 2023

Navalrocha Shipyard Completes Dredger Repair for Jan De Nul

(Photo: Navalrocha Shipyard)

Portugal’s Navalrocha Shipyard announced it has completed a multimillion-dollar repair project for Luxembourg-based company Jan De Nul Group as it targets growth across the Benelux dredging sector.The cluster-contract involving repair work to two split hopper barges and one trailing suction hopper dredger - Tiger, De Bougainville, and Le Guerrier - was finalized at the end of November 2022. Key elements of the project involved complex heavy-lift operations, to replace 40-tonne hydraulic cylinders, plus ballast water treatment system (BWTS) installations.

06 Oct 2022

Rescue Boat Resolve Pioneer Upgraded

(Photo: Resolve Marine)

Salvage, emergency response and marine services company Resolve Marine announced that its vessel the Resolve Pioneer has completed its ABS special survey and U.S. Coast Guard (USCG) certificate of inspection following a drydock at Vigor Industrial in Portland, Ore. The drydock involved various technical upgrades, hull steel renewal, painting, overhaul and cleaning of the vessel.The 207-foot rescue boat is based in Western Alaska and provides critical emergency response and oil spill readiness 24/7. The Resolve Pioneer also helps to ensure that commercial vessels transiting U.S.

29 Jun 2021

Ship Repair Yard Navalrocha Reports 'Robust' Start to 2021

Image courtesy Navalrocha Shipyard

Portugal’s Navalrocha Shipyard reports that it is continuing its robust performance through the ongoing Covid-19 pandemic with a steady pipeline of work through to 2024, with the first six months of 2021 including a series ofdrydock projects involving general cargo vessels, tugs, passenger ferries, bunker tankers, Ro-Ro Pax vessels, LPG carriers and cruise vessels.According to Navalrocha commercial director Sergio Rodrigues, order volumes are running ahead of each of the last three years…

10 Nov 2020

LNG to FSU Conversion Completed at Sembcorp

Synergy Group, one of the world’s leading ship managers, has successfully converted an LNG carrier into a Floating Storage Unit. Pictured: The FSU at Sembcorp Marine’s Admiralty Yard in Singapore. Photo: Synergy Group

Ship managers Synergy Group converted a 1992-built, 126,000 cubic meters capacity Liquefied Natural Gas (LNG) carrier into a Floating Storage Unit (FSU). The conversion was performed at Sembcorp Marine’s Admiralty Yard in Singapore.Synergy will manage, maintain and operate the FSU, which has a projected lifespan of 15 years. It will be deployed in Myanmar where it will be manned by a Synergy crew of 25 seafarers.The FSU will be moored permanently and used to receive and store…

16 Mar 2020

Winter Work on the Great Lakes

(Photo: Fincantieri Bay Shipbuilding)

Along the 1,600-mile, ice gray arch of the St Lawrence Seaway, the 2020 Great Lakes commercial shipping season will lurch back to life on March 25 when the Soo Locks at Sault Ste. Marie, Mich. reopen.The ceremonial opening signals a passage with passable ice and the 114th Great Lakes season for its fleet of 45 venerable lakers. Most of these huge self-loading freight haulers are at least 50 years old, rust free, and fit; American steel sailing on a freshwater sea.To handle Great Lakes cargo…

23 Jan 2020

More than $97 Mln in Maintenance Planned for US-flag Lakers

© Irwin Seidman / Adobe Stock

U.S.-flag lakers idled for the winter season will undergo more than $97 million in maintenance and modernization work at multiple Great Lakes shipyards before returning to service in March. The $97 million figure is an increase from $70 million in 2019, according to the Lake Carriers' Association (LCA).After working around the clock for 10 months hauling cargo over more than 70,000 miles per vessel, the ships and their crews are given a brief rest to recoup before the Soo Locks reopen and the next season starts in March…

18 Dec 2019

BWTS Retrofits Drive Navalrocha Biz

Paxoi bunker tanker, managed by MM Marine Inc (Photo courtesy of  Navalrocha shipyard)

Portugal's Navalrocha shipyard reports a strong influx of BWTS (Ballast Water Treatment System) retrofit projects for 2020.The shipyard completed its first ever BWTS installation with technical engineering partner Step Consolidated on the Paxoi bunker tanker, managed MM Marine Inc.Navalrocha Commercial Director Sergio Rodrigues said the contract sparked a series of other deals with five more BWTS retrofit projects scheduled for 2020.“The Paxoi installation process was carried out in the last quarter of 2019 during a 16-day drydocking,” he said.

26 Feb 2018

Interlake Commences 2018 Sailing Season

ATB Dorothy Ann-Pathfinder (Photo: The Interlake Steamship Company)

The Interlake Steamship Company said its articulated tug-barge unit (ATB) Dorothy Ann-Pathfinder has departed winter layup on Saturday, February 24, to begin early-season shuttles of iron ore for ArcelorMittal, an integrated steel and mining company with blast furnaces at the head of the Cuyahoga River. A workhorse of Interlake’s nine-vessel fleet, the 700-foot Dorothy Ann-Pathfinder is one of Interlake’s two River-Class vessels, a designation given to ships that can traverse the narrowest harbors of the Great Lakes.

15 Feb 2018

Vigor Adds $20 Mln Drydock

(Photo: Vigor)

Vigor built on its ongoing investments in critical infrastructure in the Puget Sound in 2017 with the $20 million investment in another drydock. At 640 ft. long with a clear width of 116 ft., the new dock will be the third, and largest, at Vigor’s Harbor Island shipyard. The drydock is expected to be operational in early first quarter 2018 and is part of Vigor’s ongoing commitment to make Harbor Island a primary destination for ship repair and conversion on the West Coast for both commercial and government customers.

01 Aug 2017

Grand Bahama Shipyard Reports Commercial Success

(Photo: Grand Bahama Shipyard Limited)

Caribbean shipyard Grand Bahama Shipyard (GBS) said it has completed work on 30 commercial vessels within first half of 2017, predominantly comprised of companies returning to the yard with repeat business including tankers, bulk carriers, containerships, tugs, dive support vessels and drilling support vessels. In what is considered a volatile market, GBS said 2017 has been a great year for repeat customers, solidifying its position as a supporter of the major U.S. East Coast…

20 Sep 2016

Ocean Endeavor Repair Completed

(Photo: Harris Pye Engineering Group)

Harris Pye Engineering Group completed repair works during the two-stage multi-million dollar Diamond Offshore demobilization project for its semi-sub rig Ocean Endeavor from the Black Sea, which completed its contract in January 2016. The initial phase of the repair work, which started in December 2015, while the rig was offshore Constanta, Romania involved cleaning of mud, brine, base oil and skimmer tanks. Steel repairs were carried out on a main column blister. The removal of three Seatrax crane pedestals…

29 Jun 2016

SPS Used for Pipe-Layer Upgrade

New top plates (Photo: SPS)

The 127,500dwt Solitaire has completed some of the most challenging projects in which heavy pipe has been laid in very deep waters. Originally built in Japan as a mini-Capesize bulk carrier, the Lloyd’s Register-classed vessel was converted to lay pipe in 1998. She has full dynamic positioning and can carry a pipe payload of 22,000 metric tons. Recently, however, the vessel’s operator Allseas decided to repair parts of the 550m2 tank top in hold number 6 which had corroded. After a detailed assessment was carried out, Allseas opted for SPS technology instead of steel renewal.

27 Aug 2015

N-KOM: New VLCC Size Floating Dock

Donnelly Tankers vessel inside new VLCC size floating dock

Nakilat-Keppel Offshore & Marine (N-KOM), the joint-venture shipyard of Keppel Offshore & Marine and Nakilat, continues to see strong interest for its ship repair services in 2015, having already delivered more than 450 projects for shipping and oil and gas companies over the past four years. Among the shipyard’s list of customers are Odfjell, Maran Gas Maritime, Diamond Shipping, Springfield Shipping, Maran Tankers, Donnelly Tankers, Synergy Maritime, Euronav, Dynacom Tankers, Jan de Nul, V Ships, Synergy Maritime, NYK Shipmanagement and many others.

13 Sep 2013

TNG: Talleres Navales Del Golfo

Talleres Navales del Golfo (TNG) shipyard at Veracruz, Mexico was originally developed as a new construction facility, but the shipyard has successfully transferred to ship repair facility with an emphasis on steelwork repair contracts. As a result of recent success in repair operations, the shipyard is currently embarking on a major development and restructuring of the shipyard, with a view to rationalizing the facilities and expanding its repair capabilities. Despite recent economic turmoil…

08 Jul 2013

QE2 to Hoist Blue Peter Again

QE2: Photo credit QE2 Holdings

Dubai's QE 2 Holdings Ltd. chairman, His Excellency Khamis Juma Buamim, sets out his company's vision of a new life for the veteran cruise liner –  as a hotel ship – in his speech to dignitories. Outlining the work that has been completed, the chairman provided details of the transfer of ownership of the vessel to a new entity called QE2 Shipping LLC, based out of & owned by Dubai & that all necessary registry documentation with the flag state on the ownership of the vessel had been completed.

09 Jun 2013

China Shipyard Repairs Seven Ships

7 vessels sailed from China's CIC Boluomiao Shipyard in May 2013, on time despite prolonged heavy rain, congested quays. Among the seven vessels were: M/V “AN PING 1” ,“HUB GRANDIOSE”, “GAS CORAL”, “XIN JIN ZHOU”, and  “WISH WAY”. The range of projects for M/V “HUB GRANDIOSE” was quite large, with steel renewal for double bottom tanks, tank tops and fore peak tanks, but following successful ballast water tests of the repars the ship sailed on time. The projects for M/V “GAS CORAL” included mechanical and electrical projects and docking. The yard started repairs on schedule with repairs to the main engine, generator and other machinery. Again the work was completed on time.

27 Feb 2013

Milestone Tankship Refit at Portugal's Lisnave Shipyard

Tankship Eagle Turin: Photo credit Lisnave

The 107,123 dwt 'Eagle Turin', owned by AET is the 100th tankship refit project to be handled at Lisnave. This milestone in today’s highly competitive ship refit market, has been achieved over a period of 15 years, it being the second time that this particular tanker has visited Lisnave for general refits. The first tanker refit project from AET was received by Lisnave during 1998 – the 102,352 dwt Eagle Auriga arriving in March of that year. At that time the attending superintendent from AET was Mr. Aw Chin Meng who, on average, has been once a year since 1998.

10 Jul 2012

Drydocks World Reiterates Offshore Sector Commitments

Drydocks World, announced the completion of maintenance work on Abu Dhabi-UAE based National Drilling Company’s (NDC) Jack-Up Cantilever type Self Elevating Drilling Platform, Delma, which was built in Brazil in 1983. Drydocks World has repaired over a 100 rigs since operations began and has implemented more projects for the offshore drilling sector in recent years as part of a deliberate strategy to serve this rapidly growing sector. The shipyard had worked on 6 rigs simultaneously this year. Delma is the first of two orders received from NDC this year.

27 Apr 2012

Chinese Shipyard Repairs Large Bulker on Time

The MV Handan Steel is an ore carrier belonging to an English company, size: LOA 330m Breadth 60m. The main engine repair involved   the chemical cleaning of the heat exchanger, M/E air cooler x 2sets, main L/O cooler x 1set, and main & auxiliary atmosphere condenser repair. The deck work scope mainly included No.5 cargo hold bulkhead partial steel renewal, E/R main engine ventilation duct to be cropped and renewed, installation of the limit for aft D/E. The coating work included  SA2 sandblasting for the bulkhead of five cargo holds from 16m high downwards with painting of two F/C, totally 14,630 m2, and the hull (16000m2) to be SA2 sandblasted with painting of two T/C, one F/C. The contracting time was 12 days.

17 Apr 2012

First Order Received by Damen Ship Repair Brest

The Alcyon (Photo: Damen).

On Wednesday, April 11, 2012, Director André Hollander and Sales Manager Theo Kloosterman proudly announced the first ship repair order of Damen Ship Repair Brest (France) by sounding the bell in the traditional way. It is the first vessel booked under the new management and comes in the second week after the acquisition of the former Sobrena Yard in Brest by the Damen Shipyards Group. The order was granted by the French offshore and subsea service provider Bourbon Offshore Surf…

16 Apr 2012

First Repair Order for Damen Shiprepair Brest

On April 11, 2012, Director André Hollander and Sales Manager Theo Kloosterman announced the first shiprepair order of Damen Shiprepair Brest (France) by sounding the bell in the traditional way. It is the first vessel is booked under the new management and comes in the second week after the acquisition of the former Sobrena Yard in Brest by the Damen Shipyards Group. The order was granted by the French offshore and subsea service provider Bourbon Offshore Surf, specialized in Subsea Umbilicals Risers Flowlines (SURF) services and concerns the docking of the Alcyon…

06 Jan 2012

Gibdock Quickly Repairs Pullmantur Zenith

Gibdock’s growing reputation as one of the leading cruise ship repair and refurbishment centres in the Mediterranean has been enhanced by the docking of the 42,255 gt, 1992-built Pullmantur Zenith. The vessel arrived in Gibraltar on November 7th for work that had to be completed within tight time constraints and left on schedule on November 20th, en route to Brazil for its next cruise itinerary. Gibdock was tasked with renewing the rudderneck bushes, which required the drilling…

23 Jun 2011

Gibdock Completes Work on Spirit of Adventure

Gibraltar-based Gibdock has recently completed a drydocking contract for UK-based Saga Holidays. Last month, the niche cruise operator docked the 9,570gt, 139m long Spirit of Adventure for a 10 day program of works, including steel repairs to the bulbous bow and a comprehensive external clean and repaint. Richard Beards, Gibdock Commercial Director, comments: “This is another important breakthrough for the yard, as it is the first time we have had the opportunity to work for Saga, which has in the past used other yards in the region.