Marine Link
Wednesday, April 24, 2024
SUBSCRIBE

Waste Disposal Systems News

13 Apr 2009

USS George H.W. Bush Acceptance Sea Trials

USS George H.W. Bush (CVN 77) successfully completed acceptance sea trials April 7-9 off the Virginia Capes and is in final preparation for delivery. Acceptance sea trials are the final test of the ship's readiness to begin fleet service. Navy representatives from the U.S. Navy Board of Inspection and Survey tested and evaluated the ship's systems and performance. Acceptance trials will formally conclude April 10. George H.W. Bush is the nation's 10th, and final, Nimitz-class carrier. The ship is designed to carry all current and future aircraft in its embarked air wing until the completion of her service life in approximately 2,059. George H. W. Bush incorporates numerous design improvements to reduce operating cost, enhance operational effectiveness and protect the environment.

15 Sep 2008

SMM Set for Hamburg

At the beginning of 2008, the order book was estimated by the British shipbuilding market experts of Lloyd's Register - Fairplay (LRF) at 10,055 ships ordered, and 329.7m gross tons (GT). By the beginning of July those figures were up more than 10 percent to 11,200 newbuildings and 363 million GT â€“ a new high. So the maritime equipment suppliers among the total of 1,950 exhibitors from 55 nations will have full order books to show at SMM 2008. This premier fair of world shipbuilding will for the first time occupy all eleven exhibition halls of the New Hamburg Trade Fair at the 23rd shipbuilding, machinery & marine technology, international Trade Fair Hamburg, to be held from September 23 to 26, which means more exhibition space than ever before, at 87,000 square meters.