Virginia Proposes Offshore Wind Project to Obama’s BOEM

MarineLink.com
Monday, July 29, 2013

As part of the Obama Administration's all-of-the-above energy strategy to continue to expand safe and responsible domestic energy development, the Bureau of Ocean Energy Management (BOEM) announced today it has received a second unsolicited request from Virginia's Department of Mines, Minerals and Energy (DMME) for a research lease offshore Virginia. DMME proposes to design, develop, and demonstrate a grid-connected, 12-megawatt (MW) offshore wind test facility on the Outer Continental Shelf (OCS) off the coast of Virginia.

BOEM will publish a "Public Notice of an Unsolicited Request for an OCS Research Lease, Request for Competitive Interest, and Request for Public Comment" in the Federal Register on July 30 to obtain public input on this research proposal, its potential environmental consequences, and the use of the area in which the proposed project would be located. BOEM is also asking whether there other entities interested in obtaining a renewable energy lease of the same scale within the same area identified by DMME that would support potential wind energy development.

On Dec. 12, 2012, the U.S. Department of Energy (DOE) announced funding awards for seven proposed "Offshore Wind Demonstration Projects" off the Nation's Coasts. One of the awards was given to Dominion Resources, Inc., which partnered with DMME and others to establish the Virginia Offshore Wind Technology Advancement Project. This project proposes to build the wind test facility on the OCS to the west of the BOEM-designated Wind Energy Area offshore Virginia. BOEM continues to work collaboratively with DOE in reviewing these projects.

Per DOE requirements, the information gained and methodologies established from this project will be shared with stakeholders (such as future developers, non-government organizations, and others) interested in wind energy development offshore Virginia at no cost to them.

Before the Virginia Offshore Wind Technology Advancement Project can install any facilities on the OCS, it must obtain BOEM approval. Therefore, DMME submitted an unsolicited nomination to BOEM on Feb. 13, 2013, for a proposal to install and operate two 6-megawatt (MW) turbines, ancillary metocean facilities, a meteorological tower or buoy and associated cabling to shore.

DMME has secured U.S. Army Corps of Engineers permits and met U.S. Coast Guard requirements for preliminary work and has initiated wildlife, archeology, geophysical and geological data collection surveys in the area to inform future agency decisions.

A map of the area and a description of the proposed research activities were provided in DMME's unsolicited request for a research lease.

Publication in the Federal Register will open a 30-day public comment period. BOEM will accept public comments regarding the research lease in the following ways:

Electronically: www.boem.gov/About-BOEM/Public-Engagement/Public-Engagement-Opportunities.aspx. Click on the "Open Comment Documents" link and follow the instructions to view relevant materials and submit comments.

In written form:
Office of Renewable Energy Programs
Bureau of Ocean Energy Management
381 Elden Street, HM 1328
Herndon, Virginia 20170-4817
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

GloMEEP Project Forges Ahead with Train-the-Trainer Workshop

A global Train-the-Trainer workshop on energy efficiency has been delivered in China (23-27 May), preparing the personnel needed to cascade knowledge on energy

Diana Charters Out Two Bulkers

Diana Shipping Inc. today announced that, through a separate wholly-owned subsidiary, it entered into a time charter contract with Bunge S.A., Geneva, for one of its Panamax dry bulk vessels,

Long Beach Port Maintains Strong Bond Rating

Fitch Ratings, one of the top three U.S. credit analysis agencies, has affirmed the Port of Long Beach’s “AA” rating on its outstanding debt. Fitch stated the AA rating — its highest for U.

Government Update

Details El Faro's Sinking Emerge from US Probe

U.S. investigators on Friday concluded two weeks of hearings into the sinking of cargo ship El Faro in a hurricane last fall that included reports the vessel had

Defense Appropriations Bill Includes $1 Bln for US Icebreaker

The U.S. Senate Appropriations Committee’s FY2017 Defense Appropriations Bill has included $1 billion in funding to accelerate construction of a new polar icebreaker for the U.

DSC Dredge Receives President’s E-Star Award

DSC Dredge, LLC, based in Reserve, La., has received the 2016 President’s “E-Star” Award for exports.   In a ceremony held on May 16, 2016, at the U.S. Department

Offshore Energy

Hercules Offshore Filing for Bankruptcy Again

Hercules Offshore Inc said it planned to file for prepackaged Chapter 11 bankruptcy, just six months after the rig contractor emerged from bankruptcy protection.

VOS Sugar First Charter

The newest addition to Vroon’s fleet, subsea-support vessel (SSV) VOS Sugar, recently started work in the BARD Offshore 1 Offshore Wind Farm (OWF). The vessel

China COSCO Moving to Offshore Winds

China COSCO Shipping, which uses bulk carriers and container vessels to transport goods, has seen its cargo business decline amid China's slowdown and has decided

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0828 sec (12 req/sec)