Cold SCAR Steel is Weapon of Choice on Baltic 2

MarineLink.com
Monday, April 15, 2013
Lewis Watt, project engineer. Photo: Ecosse Subsea Systems Ltd.

Ecosse Subsea Systems (ESS) reported a successful start to a 10-week boulder clearing and trenching campaign on the Baltic 2 offshore wind farm project.

Mobilized onboard the Siem Topaz anchor handling vessel, Ecosse Subsea’s SCAR subsea plough system is engaged on route clearing and pre-lay trenching operations on behalf of Siem Offshore Contractors. Soils have varied from dense sands and hard clays to high boulder density ranging up to four meters, but the SCAR has demonstrated its versatility and capabilities in dealing robustly with challenging conditions.

The eight-strong ESS team are completing between four and eight array routes per day depending on soil conditions and boulder density. Weather conditions have varied between calm and choppy waters with up to 4m waves, but the SCAR plough has proven its suitability for working in diverse weather situations.

Ecosse Subsea Systems project engineer, Lewis Watt, said, “We are very pleased with the initial phase of the campaign and are making good progress despite some tough geographic challenges. The SCAR’s mobility and ease of launching and recovery is ideally suited to smaller anchor handling vessels such as the Topaz and it has handled extremely well in rough conditions.

“We are on schedule to complete the workscope in early June as planned and the SCAR’s performance has been rapid and efficient, despite having to be lifted and shifted between each cable route. We have a number of tenders outstanding and there has been a marked upsurge in interest from clients who are aware of the cost saving potential of SCAR.”

The SCAR plough had earlier been truck-transported from Aberdeen to Gdansk in Poland for a fast and efficient mobilization in the Baltic.

Baltic 2 is an 80-turbine development located 32 kilometers north of Rügen Island in the Baltic Sea. The 27-square-kilometer site spans water depths ranging from 20 to 45 meters LAT and has a wide array of soil conditions from fine sands to gravels and cobbles.  

Boulder clearance and multi-pass trenching to 1.5 meters depths is being performed over a 90-kilometer route with ESS using its own ROV system to monitor, survey and record operations, while a vessel mounted multi-beam determines the quality of trenching achieved.
This 80-cable inter-array workscope follows on from two highly successful projects ESS completed on behalf of Total in Shetland and on E.ON’s Humber Gateway wind farm project in the North Sea.

Mr. Watt added that SCAR was becoming a preferred option by cable manufacturers and product warranty holders, while clients are requesting ESS adapt their tools for their specification requirements.

www.ecosse-subsea.com
 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Equipment

Tallink & Meyer Turku to Build LNG Ferry

AS Tallink Grupp and Meyer Turku Oy signed a contract for the construction of LNG powered fast ferry for Tallinn-Helsinki route shuttle operations. The dual

USCG Free Boat from Ice Near Woods Hole

A Coast Guard crew responded to a fishing vessel trapped in ice in Woods Hole Passage, Woods Hole, Massachusetts, Saturday. At about 3 p.m., the crew of the fishing boat Capt.

COMPIT to Showcase Smarter Ships, Systems & Solutions

The 14th International Conference on Computer and IT Applications in the Maritime Industries (COMPIT) will take place from 11th to 13th May 2015 in Ulrichshusen, Germany.

Wind Power

Spanish Boat Wins Leg of Ocean Race

Spanish boat Mapfre has claimed victory in the Auckland leg of the of the round-the-world Volvo Ocean Race from Sanya, China, to Auckland.   The Alicante-based

James Fisher Wind Farm Support Vessel Named

James Fisher Marine Services’s (JFMS) multipurpose wind farm support vessel, Dart Fisher, has been formally named by the vessel’s Godmother Maria McCaffery MBE,

Offshore Energy

Johan Sverdrup Contract to "Pioneering Spirit"

Statoil has signed a contract with Allseas for installation of three platform topsides on the Johan Sverdrup field.   The vessel will be installing the topsides for the drilling,

1st lifejacket for Working at heights

The first lifejacket custom-designed specifically for offshore personnel carrying out rope access or work at height has been developed by Survitec Group, the

Hercules Offshore Shares Fall 33%

Drilling contractor Hercules Offshore Inc's shares fell as much as 33 percent to a record low on Friday, a day after Deutsche Bank cut its price target on the company's stock to $0.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.7613 sec (1 req/sec)