Cold SCAR Steel is Weapon of Choice on Baltic 2

MarineLink.com
Monday, April 15, 2013
Lewis Watt, project engineer. Photo: Ecosse Subsea Systems Ltd.

Ecosse Subsea Systems (ESS) reported a successful start to a 10-week boulder clearing and trenching campaign on the Baltic 2 offshore wind farm project.

Mobilized onboard the Siem Topaz anchor handling vessel, Ecosse Subsea’s SCAR subsea plough system is engaged on route clearing and pre-lay trenching operations on behalf of Siem Offshore Contractors. Soils have varied from dense sands and hard clays to high boulder density ranging up to four meters, but the SCAR has demonstrated its versatility and capabilities in dealing robustly with challenging conditions.

The eight-strong ESS team are completing between four and eight array routes per day depending on soil conditions and boulder density. Weather conditions have varied between calm and choppy waters with up to 4m waves, but the SCAR plough has proven its suitability for working in diverse weather situations.

Ecosse Subsea Systems project engineer, Lewis Watt, said, “We are very pleased with the initial phase of the campaign and are making good progress despite some tough geographic challenges. The SCAR’s mobility and ease of launching and recovery is ideally suited to smaller anchor handling vessels such as the Topaz and it has handled extremely well in rough conditions.

“We are on schedule to complete the workscope in early June as planned and the SCAR’s performance has been rapid and efficient, despite having to be lifted and shifted between each cable route. We have a number of tenders outstanding and there has been a marked upsurge in interest from clients who are aware of the cost saving potential of SCAR.”

The SCAR plough had earlier been truck-transported from Aberdeen to Gdansk in Poland for a fast and efficient mobilization in the Baltic.

Baltic 2 is an 80-turbine development located 32 kilometers north of Rügen Island in the Baltic Sea. The 27-square-kilometer site spans water depths ranging from 20 to 45 meters LAT and has a wide array of soil conditions from fine sands to gravels and cobbles.  

Boulder clearance and multi-pass trenching to 1.5 meters depths is being performed over a 90-kilometer route with ESS using its own ROV system to monitor, survey and record operations, while a vessel mounted multi-beam determines the quality of trenching achieved.
This 80-cable inter-array workscope follows on from two highly successful projects ESS completed on behalf of Total in Shetland and on E.ON’s Humber Gateway wind farm project in the North Sea.

Mr. Watt added that SCAR was becoming a preferred option by cable manufacturers and product warranty holders, while clients are requesting ESS adapt their tools for their specification requirements.

www.ecosse-subsea.com
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter February 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Equipment

Premier Oil and Rockhopper Abandon Ocean Rig Contract

Two of the major British players in Falkland Islands offshore oil development, Premier Oil and Rockhopper Exploration, cancelled a joint venture contract with Ocean Rig UDW.

Teknotherm Marine Moves HVAC Arm to Bergen

Maritime heating, ventilation and air conditioning (HVAC) firm Teknotherm Marine has established a new subsidiary is established with the name Teknotherm Marine HVAC AS.

Sentinel Launches New Rudder Feedback Unit

Sentinel, a Beier Radio company, has designed and manufactured a new Rudder Feedback Unit (RFU) with many new features, including watertight components and connections

Wind Power

Brazil's CEEE to sell stakes in Wind Farms, Dams

Brazil's Companhia Estadual de Energia Elétrica (CEEE), a power utility controlled by the state of Rio Grande do Sul, will sell assets including stakes in wind farms,

Gamesa, Siemens Negotiating Wind Merger Terms

German engineering group Siemens and Spanish renewable energy group Gamesa are in final negotiations on a deal to merge their wind power assets, two sources familiar

SevenCs Supports MariGreen Project

SevenCs is part of the EU INTERREG V A cross-border project “MariGreen” to support the maritime industry in the transition towards more efficient, greener and more sustainable shipping.

Offshore Energy

Premier Oil and Rockhopper Abandon Ocean Rig Contract

Two of the major British players in Falkland Islands offshore oil development, Premier Oil and Rockhopper Exploration, cancelled a joint venture contract with Ocean Rig UDW.

US Oil Drillers Cut Rigs to Least in 6 Years

U.S. energy firms this week cut oil rigs for an eighth week in a row to the lowest levels since January 2010, data showed on Friday, as energy firms continue to

Eni, Exxon, Statoil Win Irish Offshore O&G Licences

The Irish government said on Thursday it had awarded oil and gas licences to companies including oil majors Eni, Exxon and Statoil , allowing them to explore for hydrocarbons off the coast of Ireland.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0839 sec (12 req/sec)