Wellboat Order for Spain Shipyard

Press Release
Friday, March 29, 2013
Well Boat: Image credit Zamakona Yards

Sølvtrans has signed a contract with  Zamakona Yards for the construction of another well-boat (live-fish carrier).

Delivery is scheduled to early 2014. The vessel is a sister ship of Rojna Polaris, currently under construction at Zamakona Yards, and in addition, Solvtrans has entered an option for two additional vessels with delivery in second half of 2014 and first half of 2015.

The investment, amounting to some NOK 250 million (€ 22 million) per vessel, will be funded through a combination of internal means and bank loans.

The new vessels will be constructed according to the same specifications as Ronja Polaris and thus have state of the art technology and environmentally friendly solutions. (A “wellboat ” is a vessel with tanks intended for transporting live fish, for this particular ship the tank capacity is 3,200 cu.m).

Roger Halsebakk CEO of Norway's Solvtrans says “We experience an increasing imbalance in the well-boat market. A combination of new licences, continued consolidation and stricter regulations in the farming industry has increased demand for modern tonnage. The new build is a direct response to this development, and the options are core to the company’s strategy to renew and expand the fleet, preparing the company for further growth. The choice of Zamakona Yards as supplier is based on Sølvtrans’ good experiences from the ongoing construction of Ronja Polaris”.

The option for two additional vessels can be exercised until 30 June 2013. The contract is subject to financing.
 

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Henderson, Hanes & Associates Opens Doors in Miami

Ocean Engineering/ Naval Architecture Firm Brings Innovation to the Mega Yacht Community The Miami-based ocean engineering and naval architecture firm of Henderson & Associates, Inc.

Austal Launches Trenton (JHSV 5)

Second Joint High Speed Vessel to be launched at Austal in 2014 On September 30, 2014, Austal USA successfully completed the launch process of Trenton (JHSV

Going Big for Sustainability

Orkot Marine Bearings, developed and manufactured by Trelleborg Sealing Solutions, contribute to the build of the world’s largest and most efficient containerships,

Workboats

MAN Propulsion Packages for New Trawler Series

Orders for five fresh-fish trawlers feature two different ship designs and MAN 6L27/38 engines and aft-ship equipment Icelandic owners, HB Grandi, Vinnslustodin hf.

Nigerian Customer Orders Ninth Damen Dredger

A Nigerian customer has added its ninth Damen dredger to its fleet. The Cutter Suction Dredger type CSD500 was chosen due to the availability of Damen Field Services in Nigeria,

Power and Endurance Ready for Austrailian Waters

Wamalhanha is the final newbuild in a series of six tugs of the Robert Allan Design, RAstar 3200 where her main duties will be terminal activities, escort duties, ship assist, towage duties.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1347 sec (7 req/sec)