Windwave First to Launch Damen FCS 2008

MarineLink.com
Wednesday, April 30, 2014
Image: Damen

First contract for new type of Damen Twin Axe catamran

Damen announced that Windwave Workboats will be the launching customer of the Twin Axe Fast Crew Supplier (FCS) 2008.The Twin Axe FCS 2008 is a smaller version of Damen’s successful FCS 2610 which launched in 2011 and has subsequently become the industry standard for the offshore wind market, given its capability of operating further offshore in rougher weather conditions, while ensuring safe and comfortable transfers for those on board.

Based in Penzance, Cornwall, Windwave Workboats has been providing offshore wind farm support and crew transfer services to the renewable energy industry since 2008. This latest addition is the company’s first Damen vessel.

Windwave Workboats Commercial Director, Peter Scriven, commented, "In recent years vessel designs have been pushing what can be achieved within the 24m load line limit. We listen carefully to our clients and understand that bigger is not always better for some of their usage scenarios but they have demands for vessels that require greater performance than anything else currently available on the market.

"The Damen FCS 2610 was a game changer when it was first introduced and kick started the trend for larger boats and is still the preferred large boat option, as can be seen by their demand in the North Sea. Our clients have had a lot of success in using them; however it is too large for some operations. In response, Damen have now developed the FCS 2008 which makes it the obvious choice for our applications.”

Arjen van Elk, Damen Sales Manager U.K. & Ireland, said, “Windwave Workboats came to Holland to take the FCS 2008 for sea trials in a rough North Sea. The experienced crew was immediately impressed by the capabilities of the vessel. We are now outfitting a vessel to Windwave Workboats’ requirements.”

The company wanted to have accommodation on board to overnight in the harbor, so two cabins with three bunks are being installed in the hulls. As well as this, the railing on the foredeck has been changed making the foredeck more spacious. A crane is also being placed on the foredeck. The FCS 2008 can also carry 2 x 10 ft containers, on the stern and bow.

“The 20m version is the perfect boat for near-shore wind farms and ideal for transferring personnel safely, as well as light cargo, said Peter Robert, Damen Business Development Manager Offshore Wind. “With this move the Twin Axe offshore wind range is completed. Damen decided to row against the current in 2011 when we decided to build the bigger 26 m vessel. We saw that there was simply nothing suitable available. Meanwhile, the turbines were getting larger, wind farms were going further offshore, so developers were less interested in the smaller 14-15 m vessels. We started with the large vessels and now others have followed.”

Robert  continued,“But of course, you don’t need a 26 m vessel for every wind farm. Damen needed a smaller vessel in its offshore wind portfolio. It is important to look into the optimum spread of vessels to have the best Total Cost of Ownership for your fleet, as well as for the wind farm owner. We think this new type will be used to replace the older, smaller vessels.

“With our first customer, the market will now see her capabilities.”

The FCS 2008 will officially launch at Seawork International in June. Being built at Damen Shipyards Den Helder, three more vessels are available from stock, the first from end-April.

The Twin Axe FCS 2008 (20 m x 8 m) is an aluminum, high-speed vessel for transferring personnel and light cargo. It has 2 x MTU engines (1930 BHP) giving a speed of 24.5 knots. Classed by Bureau Veritas, the vessel has a capacity for 12 passengers on deck level and spacious accommodation.

The vessel includes 12 passenger seats, a galley and two toilets are on deck level, together with ample storage space. There is internal access from the deck level to the wheelhouse, which has a helmsman’s seat, navigation seat and chart table. The two hulls accommodate engine rooms, storage and optional cabins.

damen.com
 

  • Image: Damen

    Image: Damen

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

China Shipbuilders may Merge to Stay Afloat

The China's four state-run shipping-related companies  are reportedly in the initial phases of combining units in order to beef up the national shipbuilding industry, says local media.

Termination of Seadrill Unit's and Rosneft Deal Extended

North Atlantic Drilling (NADL), a subsidiary of Seadrill, will delay the closing of a deal with Russia's Rosneft by two years and has agreed to renegotiate the terms of the agreement,

Taiwan's Yang Ming Marine to Add Bigger Vessels to its Fleet

Yang Ming Marine Transport Corporation, Taiwnanese global shipping and logistics services company,  will take delivery of 14 large-sized ships over the next two years,

Vessels

Taiwan's Yang Ming Marine to Add Bigger Vessels to its Fleet

Yang Ming Marine Transport Corporation, Taiwnanese global shipping and logistics services company,  will take delivery of 14 large-sized ships over the next two years,

Qatar to Contract 6,000 Rooms on Cruise Ships for 2022 World Cup

Reviving an idea to lodge some football fans and guests during the 2022 World Cup in “floating hotels,” the Qatar Tourism Authority (QTA) has announced plans to contract at least 6,

Star Bulk Adds Jennifer

Star Bulk Carriers Corp has added M/V Star Jennifer (ex "Ore Hansa), a 82,290 dwt Kamsarmax bulk carrier, built in 2006, to its fleet.   The Company completed

Wind Power

CWind Orders Four Crew Transfer Vessels

CWind, a provider of services to the offshore wind industry, has placed an order for four new crew transfer vessels from Aluminium Marine Consultants (AMC), a shipbuilding

Fugro Expertise for Wind Farm Developers in Netherlands

Fugro has been contracted by the Netherlands Enterprise Agency, part of the Ministry of Economic Affairs, to execute the geotechnical site investigation and

Aeolus Installs First Luchterduinen Turbine

The construction of the new offshore wind farm Luchterduinen entered its final and most noticeable phase yesterday, with the installation of the first wind

Offshore Energy

Termination of Seadrill Unit's and Rosneft Deal Extended

North Atlantic Drilling (NADL), a subsidiary of Seadrill, will delay the closing of a deal with Russia's Rosneft by two years and has agreed to renegotiate the terms of the agreement,

Chevron Hires Norce Endeavour for Thailand Ops

Solstad Offshore ASA (SOFF) has fixed the 2011-built 18,000 dwt crane barge Norce Endeavour to Chevron for work in Thailand next year for around 200 days.   Solstad

PSV Launching Ceremony at Gondan

At high tide today at Gondan Shipyard in Figueras, the New PSV (TBN) for the Norwegian Ship-Owner, Simon Møkster Shipping, was launched. Different personalities

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4196 sec (2 req/sec)