Second Zumwalt-class Destroyer Keel Laid

Press Release
Thursday, May 23, 2013
USS Michael Monsoor illustration: courtesy of USN

Future 'USS Michael Monsoor' (DDG 1001) keel authenticated at the General Dynamics-Bath Iron Works shipyard.

The keel authenticators were George and Sally Monsoor, parents of the ship's namesake Medal of Honor recipient Petty Officer Second Class Michael A. Monsoor. They confirmed that the keel is "truly and fairly" laid by having their initials welded into a steel plate that will be affixed to the ship's hull. 


"Together with Bath Iron Works, we're very honored to have the Monsoor family with us here today to commemorate the first milestone in bringing this ship to life," said Capt. Jim Downey, DDG 1000 program manager, Program Executive Office, Ships. "This extremely capable warship is a lasting tribute to Petty Officer Monsoor's bravery and sacrifice and will symbolize his strength and dedication for generations to come." 



Petty Officer Second Class Michael A. Monsoor, a U.S. Navy SEAL, was posthumously awarded the Medal of Honor for his heroic actions while serving in Ramadi, Iraq, in 2006.

The USS Michael Monsoor (DDG 1001) will be a multi-mission surface combatant tailored for advanced land attack and littoral dominance. The ship's mission is to provide credible, independent forward presence and deterrence and to operate as an integral part of naval, joint or combined maritime forces. The ship will be 610 feet in length, have a beam of 80.7 feet and displace approximately 15,000 tons. 


Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

LNG: Did the Greeks Get it Wrong?

In December 2013, Alibra’s market report front page read: “When in shipping, do as the Greeks do.” At that time, Alibra was referring to the fact that 31% of the

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

Navy

NASSCO Bags USS Oak Hill Modification Award

General Dynamics NASSCO-Norfolk was awarded a $42 million cost-plus-award-fee modification to a previously awarded contract for the repair and alteration for the USS Oak Hill (LSD-51).

Panama Canal Launches Green Award System

The Panama Canal has launched the Green Connection Award, a new initiative to recognize customers who demonstrate excellent environmental stewardship, and to encourage

US Navy Tests Latest Aegis Weapon System

The U.S. Navy conducted a series of cooperative air defense test exercises with the Spanish navy that culminated in live missile firing events using the latest Aegis Weapon System baseline July 20-21.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0804 sec (12 req/sec)