Second Zumwalt-class Destroyer Keel Laid

Press Release
Thursday, May 23, 2013
USS Michael Monsoor illustration: courtesy of USN

Future 'USS Michael Monsoor' (DDG 1001) keel authenticated at the General Dynamics-Bath Iron Works shipyard.

The keel authenticators were George and Sally Monsoor, parents of the ship's namesake Medal of Honor recipient Petty Officer Second Class Michael A. Monsoor. They confirmed that the keel is "truly and fairly" laid by having their initials welded into a steel plate that will be affixed to the ship's hull. 


"Together with Bath Iron Works, we're very honored to have the Monsoor family with us here today to commemorate the first milestone in bringing this ship to life," said Capt. Jim Downey, DDG 1000 program manager, Program Executive Office, Ships. "This extremely capable warship is a lasting tribute to Petty Officer Monsoor's bravery and sacrifice and will symbolize his strength and dedication for generations to come." 



Petty Officer Second Class Michael A. Monsoor, a U.S. Navy SEAL, was posthumously awarded the Medal of Honor for his heroic actions while serving in Ramadi, Iraq, in 2006.

The USS Michael Monsoor (DDG 1001) will be a multi-mission surface combatant tailored for advanced land attack and littoral dominance. The ship's mission is to provide credible, independent forward presence and deterrence and to operate as an integral part of naval, joint or combined maritime forces. The ship will be 610 feet in length, have a beam of 80.7 feet and displace approximately 15,000 tons. 


Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

Navy

Today in U.S. Naval History: September 2

Today in U.S. Naval History - September 2 1918 - Navy ships and crews assist earthquake victims of Yokohama and Tokyo, Japan 1940 - Destroyer-for-Bases agreement between U.

STS Young Endeavour Prepares for World Voyage

The Royal Australian Navy operated Sail Training Ship, Young Endeavour, is undergoing maintenance work in preparation for a 12-month world circumnavigation. It

Newport News Selects Paramarine Design Software

QinetiQ’s Paramarine Ship and Submersible Design Software has been selected by Newport News Shipbuilding (NSS) as its primary naval architectural software. QinetiQ

 
 
Maritime Contracts Maritime Security Offshore Oil Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1789 sec (6 req/sec)