Alstom Wins Repeat Order For Cable Layer

October 7, 1999

The Marine and Offshore division of Alstom Drives & Controls has been awarded a contract by James Fisher & Sons to provide a replacement power management, alarm and monitoring system for installation on the C/S Nexus cable layer. This is the second such order for Alstom from James Fisher, who granted the company a contract in 1993 for the supply and installation of a DPS901 Simplex Dynamic Positioning System onboard the same vessel. The new power management system utilizes the same hardware as the positioning system, complementing the Alstom equipment already in use of the C/S Nexus.

Related News

Gulf Intercoastal Waterway Closed After Barge Strikes Bridge in Galveston Van Oord Launches Giant Offshore Wind Installation Vessel Containership Lost Power Several Times Before Striking Bridge in Baltimore Suspected Somali Pirates Taken to Seychelles Russia Steps in After India Drops Safety Cover for Sanctioned Vessels