CNOOC Announces Startup of New Platform

December 7, 2007

CNOOC Limited announced that Platform C of Phase of Penglai (PL) 19-3 has come on stream successfully. This is the first Wellhead Platform starting production in Phase â…¡development of PL19-3. The development facilities in Phaseâ…¡of PL19-3 include: 5 wellhead platforms, a central processing facility and a world-class FPSO, with a designed processing capacity of 190,000 barrels of oil per day.

PL19-3 oil field is located in Block 11/05 in Bohai Bay, the largest oil field offshore China currently. The field is jointly developed by CNOOC Ltd. and ConocoPhillips China Inc. (COPC). CNOOC Ltd. holds 51% interest of PL 19-3 and the Operator, COPC holds the rest 49%. Phase of PL 19-3 has started production successfully in December 2002.

Related News

ABS to Class Edison Chouest's Offshore Wind Feeder Fleet Houthis Claim More Ship Attacks, Targetting US Warship and Merchant Vessel Stena’s Ro-Pax Vessel with Wärtsilä Propellers Obtains DNV Silent Operations Notation Van Oord Launches Giant Offshore Wind Installation Vessel Containership Lost Power Several Times Before Striking Bridge in Baltimore