Tall Ship Christian Radich Returns For Dry Docking

April 29, 2014

 

A&P Tees, part of the A&P Group once again welcome the Christian Radich for dry docking. The three masted, 72 x 10m vessel plans to stay for 30 days.

The Scope of Work includes cleaning and painting, removal of bow spirit for repairs, tank steel repairs/renewals including riveting, replacement of water tank, conversion of forepeak tank to black water tank, renewal of funnel exhaust pipes and replacement galley flooring.

Having also worked on the ‘Tall Ship’ in 2011, it certainly is a change of vessel type to be working on at the Tees site from generally dealing with dredgers, gas carriers and cargo vessels.
 

Related News

ESL Shipping's First Plug-in Hybrid Vessel Electramar Christened 'Tug Drone': KOTUG Pilots Innovative Line Transfer Solution Gulf Intercoastal Waterway Closed After Barge Strikes Bridge in Galveston Van Oord Launches Giant Offshore Wind Installation Vessel Silversea Takes Delivery of New Cruise Ship Silver Ray