NASSCO Awarded $9.2m Repair Contract

September 30, 2008

National Steel and Shipping Co., San Diego, Calif., is being awarded a $9.2m modification to previously awarded contract (N00024-06-C-4402) for the repair and alteration for non-docking Chief of Navy Operations-scheduled availability for the USS Cleveland (LPD-7). The work to be provided furnishes the material, supports (electrical, crane, and rigging) and facilities necessary for the maintenance and modernization of the LSD/LPD class ships. This availability includes the instillation of 20,000 sq. ft. of synthetic well deck planking and the 5-Year Strength and Integrity Inspection of the Auxiliary Boiler No. one and no. two. Work will be performed in San Diego, Calif., and is expected to be completed by Dec. 2008. Contract funds in the amount of $9.2m  will expire at the end of the current fiscal year. The Southwest Regional Maintenance Center, San Diego, Calif., is the contracting activity.

Related News

Houthis Will Target All Ships Heading to Israel, Group Says UK Imposes Sanctions Over Russia-North Korea ‘Arms-for-oil’ Trade No Shortage of Good Ideas to Address the Mariner Shortage Russia Steps in After India Drops Safety Cover for Sanctioned Vessels Silversea Takes Delivery of New Cruise Ship Silver Ray