Konsberg Extends Deliveries to OMAN

January 7, 2008

Spanish engineering contractor, Tecnicas Reunidas (TR), has placed an order for a Dynamic Simulation Study of critical depletion compressors with Kongsberg Maritime's Oil & Gas division Process Simulation & Optimization Business Unit. The USD600M Engineering, Procurement and Construction (EPC) contract was awarded to TR-Oman by Petroleum Development Oman (PDO) in 2006 with completion anticipated for Q2 2009. The scope of supply includes a series of compressors designed to increase output of gas and to ensure a more stable flow. Kongsberg Maritime, using its proprietary dynamic simulation tool ASSETT, will model a section of the plant. The study calls for the dynamic simulation of alternative conditions in order to optimize the compressor`s performance and will be performed in close collaboration with TR`s Ute Saih Rawl engineers in Madrid, Spain. Kongsberg Maritime's Oil & Gas division has supplied a range of Operator Training Simulators in the past to PDO.

Related News

Foundation Installs Kick Off at Dogger Bank B Silversea Takes Delivery of New Cruise Ship Silver Ray UK Confirms It Will Build Six New Warships Collapsed Baltimore Bridge Blasted into Pieces Salvors Set to Blast Collapsed Baltimore to Pieces