Crane Barge Drydocked at Great Lakes Shipyard

November 28, 2016

Ryba Marine’s crane barge CT-150 (150’ x 50’ x 10’) was recently in drydock at Great Lakes Shipyard for maintenance and repairs.

Great Lakes Shipyard’s contract, awarded by Ryba Marine on October 28, 2016, included drydocking, steel repairs and ABS Load Line Inspection and renewal. The work wrapped up on November 14, 2016.
Photo: Great Lakes Shipyard
Photo: Great Lakes Shipyard
Photo: Great Lakes Shipyard
Photo: Great Lakes Shipyard
As a regular customer at Great Lakes Shipyard over the past year, Ryba Marine has sent several vessels for drydocking at the yard, including dump scow GL-5 (170’ x 41’ x 15’), GL-6 (170’ x 41’ x 15’), tug Thomas R. Morrish and tug Kathy Lynn.

Related News

Russia Shipping Oil to North Korea Above UN Mandated Levels Metal Shark Building 22 Vessels for Jamaica's Coast Guard Shipbuilding: Tanker Orders Up 32% Year-on-year Simulator Project Aims to Improve Fishery Safety Cruise Operator Viking Makes Strong NYSE Debut