Kosmos Energy Update on Drilling Cedrela-1 Exploration Well

July 7, 2011

Kosmos Energy KOS 0.00% today provided an update on the company's drilling of the Cedrela-1 exploration well offshore the Republic of Ghana. The "Transocean Marianas" semi-submersible drilling rig, under contract to another operator in Ghana, was expected to arrive at the Cedrela-1 well location on the West Cape Three Points Block on or about July 10 to commence drilling Kosmos' Cedrela-1 well near the block's southern boundary. The rig was rendered temporarily inoperable following a reported anchor-handling incident on the Offshore Cape Three Points Block, which is east of the Kosmos-operated West Cape Three Points Block. The incident occurred while preparations were being made to move the rig from the other operator's block to the Cedrela-1 well location.
Kosmos has delivered a force majeure notice to the government of Ghana and the Ghana National Petroleum Corporation due to the delay in the rig's scheduled arrival at the Cedrela-1 well location. As a result, Kosmos has begun a search for a substitute drilling rig and intends to drill the Cedrela-1 well when either the "Transocean Marianas" or an alternative rig becomes available. The company has the necessary approvals to drill the Cedrela-1 well and anticipates that a rig will be available soon.
Kosmos is the operator of the West Cape Three Points Block in which the company holds a 30.875% interest. An affiliate of Anadarko Petroleum Corporation has a 30.875% interest; an affiliate of Tullow Oil plc has a 22.896% interest; E.O. Group Limited has a 3.5% interest; Sabre Oil & Gas Holdings Limited has a 1.854% interest; and the Ghana National Petroleum Corporation has a 10% carried interest.

Related News

Houthi Leader Vows to Escalate Attacks on Merchant Shipping Japan’s First Offshore Solar Demonstrator Hits Water in Tokyo Ulstein Verft Begins Outfitting Olympic's Next CSOV Marlink Upgrades Simon Møkster Shipping’s Network Liza Unity is First FPSO to Earn ABS REMOTE-CON Notation