NNS Gets $107M More For CVN21
July 10, 2003
Newport News Shipbuilding and Drydock Co., Newport News, Va., is being
awarded a
$107,591,106 cost-plus-fixed-fee modification to previously awarded
contract
N00024-00-C-2108 for continued CVN 21 pre-system development and design
efforts,
including engineering design and related efforts, for the Future
Aircraft Carrier
Program. Work will be performed in Newport News, Va. (58%), and Groton,
Conn.
(42%), and is expected to be completed by April 2004. Contract funds
will not
expire at the end of the current fiscal year. The Naval Sea Systems
Command,
Washington Navy Yard, D.C., is the contracting activity.
Related News
ESL Shipping's First Plug-in Hybrid Vessel Electramar Christened
UK Imposes Sanctions Over Russia-North Korea ‘Arms-for-oil’ Trade
Babcock, Saab team on Future Navy Ships
Containership Lost Power Several Times Before Striking Bridge in Baltimore
Russia Steps in After India Drops Safety Cover for Sanctioned Vessels