GTT Wins LNG Carrier Tank Design Order from Samsung

January 18, 2021

French engineering firm GTT said it has received an order from the Korean shipyard Samsung Heavy Industries (SHI) for the tank design of a new 174,000-cubic-meter-capacity liquefied natural gas (LNG) carrier on behalf of the Korean ship-owner Pan Ocean.

GTT will design the tank, which will be fitted with the Mark III Flex membrane containment system. The delivery of this vessel is scheduled for the second quarter of 2023.

This order is the first of the year for GTT, the company said. It follows a series of 29 LNG carriers orders received in the second half of 2020. GTT noted that these orders, except for one, will be delivered over a longer period than usual, spreading over 2023 to 2025.

Related News

New EU Sanctions Could Hit Russian Shipping Senegal's O3S Orders Fast Supply Vessel from Penguin Sea Drone Warfare has Arrived, and the US is Floundering Royal Navy Seizes Over $250M Worth of Drugs in Caribbean Sea Unified Command Prepares for Removal of Bridge Piece on Top of Dali