GTT Wins New Order from DSME

October 22, 2018

French firm GTT said it received an order from the South Korean shipyard Daewoo Shipbuilding and Marine Engineering (DSME) for the tank design of a liquefied natural gas (LNG) carrier offering a capacity of 173,400 cubic meters. The tanks will be fitted with the NO96 GW technology.

This vessel will be built on behalf of a European shipowner for delivery expected by first half 2021.

Related News

Recruiter to Cooperate in Deal with Workers Suing Major US Shipbuilders Constant Port Attacks Slowing Ukraine's Farm Exports Insurers Brace for Multibillion Dollar Losses After Baltimore Ship Tragedy Cargo Ship Lost Power Before Slamming Bridge in Baltimore LiveStream: Rescuers Search Water for Survivors After Ship Collides with Baltimore Bridge