Basin Utilities News

Malfunction Underscores Need for Second Poe-Sized Lock

A malfunction of the Poe Lock at Sault Ste. Marie, , on September 24 has illustrated the pressing need for Congress to appropriate the funds to build another lock capable of handling the largest U.S.-Flag Great Lakes freighters. Although the vessel delays totaled only about three hours, had the problem been more severe, cargo movement on the Lakes would have slowed to a trickle. U.S.-Flag Lakers whose length and/or beam restrict them to the Poe Lock represent 70 percent of U.S.-Flag carrying capacity. “The Poe Lock that connects Lake Superior to the lower Great Lakes is the single point of failure that can cripple shipping,” said James H.I. Weakley, President of Lake Carriers’ Association. “In 2007, the Poe Lock handled nearly 65 million tons of cargo.